My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - CATCH BASIN PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
05/19/2015
>
25C - AGMT - CATCH BASIN PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2015 5:02:52 PM
Creation date
5/14/2015 4:34:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
5/19/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement with United Storm Water, Inc. <br />May 19, 2015 <br />Page 2 <br />basin clean -up effort easier and will help the City comply with upcoming NPIDES permit <br />requirements to keep trash from entering open channels, <br />The grant guidelines specify the use of pre - qualified contractors and devices. OCTA, In <br />coordination with the County of Orange, pre - qualified contractors to purchase and Install specific <br />devices, Including automatic retractable screens, connector pipe screen full- capture systems, <br />and catch basin inserts, <br />The five OCTA pre - qualified contractor /vendors are: <br />ontractorN ndor <br />Location <br />Coanda Inc. <br />Irvine CA <br />G2 Construction <br />Garden Grove, CA <br />Revel Environmental Manufacturing, Inc. <br />Concord, CA <br />TRC Solutions Inc, <br />Irvine, CA <br />United Storm Water, Inc. <br />City of Industry, CA <br />Two of the contractor /vendors offer the City- specified devices. The contractor /vendor, device, <br />and corresponding price are shown In the table below: <br />No. <br />_ontractorNendcr <br />Construction Administration <br />Device <br />PP i� ca/�id <br />1 <br />United Storm Water, Inc. <br />Connector Pipe Screen <br />$3613.31 <br />$611,200 <br />an size <br />2 <br />02 Tech <br />Connector Pipe Screen <br />$475,00 to $575.00 <br />de ondln on size <br />Based on costs and experience, staff recommends selecting United Storm Water, Inc., to install <br />547 Connector Pipe Screens at a contract cost not to exceed $201,600. <br />The estimated total project cost is $511,200 (see Project Expenditure Summary below). <br />EXPEN <br />Design <br />$20,160 <br />Construction Administration <br />$30,240 <br />Inspection <br />$57,600 <br />Maintenance <br />$201600 <br />Total Project cost <br />$611,200 <br />On February 17, 2015, the City Council approved an amendment to the Fiscal Year 2014/15 <br />Seven -Year Capital Improvement Program (CIP) to add the Residential Catch Basin CPS <br />Installation Project and recognize $200,000 In Measure M2 grant funds, The City will assume <br />ownership of the system after the proposed project Is completed, which Is anticipated by mid - <br />2015, <br />25C -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.