My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT - LED STREET LIGHTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
05/19/2015
>
25D - AGMT - LED STREET LIGHTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2015 5:05:17 PM
Creation date
5/14/2015 4:34:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25D
Date
5/19/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
be Included In the lump sum costs proposed. The Proposer may need to excavate to access and <br />disconnect the existing conduit sweeps at the pole foundations to properly pull the new wire. All costs <br />for excavation, including hardscape replacement and conduit disconnect/reconnect shall be included <br />in the lump sum price. <br />Scope of work includes the following: <br />Install new service pedestals per specifications. <br />Remove existing cable from conduit. <br />Intercept existing conduit and install new conduit and pull boxes to connect to new service <br />points, <br />Re -wire system using existing conduit. <br />Replace any deteriorated conduit only if it is impossible to pull the new wire through. <br />Remove and salvage existing fixtures. <br />Rewire poles and install new fuses and fixtures, etc. per City Standard #1126 -F. <br />Material List: <br />Fixtures: Powerlux PLEDMR /DV/B/9/4000/7401120- 277/SA <br />Wire; THW red, black, green <br />Conduit: 2" Schedule 80 PVC <br />Fuses: 240V 10A with holder per City Standard #1126 -F two (2) per pole <br />Service Pedestals: Milbank MILCP3B1 11 15A22SP33 120/240V w/ GFI duplex receptacles; <br />base MILCP16PDMNTCALT <br />PART II SPECIAL PROVISIONS <br />I. EXCAVATING AND BACKFILLING <br />Excavating and backfilling shall conform to Section 86.2.01, "Excavating and Backfilling" of the <br />California State Specifications (CSS) and these Special Provisions. <br />The following paragraph shall be added to Section 86 -2,01: <br />All excavated material in roadway shall be removed from the site and backfilled with compacted <br />crushed aggregate base material topped with temporary asphalt concrete on the same working day <br />as removed. A temporary alternative to backfllling; with permission of the Agency, shall be the <br />placement of steel plates with temporary asphalt concrete ramping at edges of the steel plates. Such <br />plating shall not be allowed for more than five (5) working days, after which backfill shall be required. <br />25D -14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.