My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLEMING INTERNATIONAL INC. - 2014
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2021
>
FLEMING INTERNATIONAL INC. - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 4:19:13 PM
Creation date
5/21/2015 12:57:42 PM
Metadata
Fields
Template:
Contracts
Company Name
FLEMING INTERNATIONAL INC.
Contract #
A-2014-273
Agency
FINANCE & MANAGEMENT SERVICES
Council Approval Date
10/21/2014
Insurance Exp Date
9/1/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deviation from these hours/days shall not be permitted without the prior consent of the Project <br />Manager, except in emergencies involving immediate hazard to persons or property, or as <br />specified otherwise. <br />1;14 CONTRACTOR'S EQUIPMENT AND FACILITIES <br />This section shallconform to Subsection 7-1 of the Standard Specifications and these Special <br />Provisions. <br />The Contractor shall comply with all local sound control and noise lever rules, regulations and <br />ordinances which apply to any work performed pursuant to the contract, Each internal combustion <br />engine, used for any purpose on the job or related to the job, shall be equipped with a muffler of a <br />type recommended by the Manufacturer, The noise level from the Contractor's operations shall not <br />exceed 95 dba at a distance of 50 feet. This requirement in no way relieves the Contractor from <br />responsibility for complying with local ordinances regulating noise level. <br />The said noise level requirements shall apply to all equipment on the job or related to the job, <br />including but not limited to trucks, transit mixers, or transient equipment that may or may not be <br />owned the Contractor. The use of loud signals shall be avoided in favor of light warnings, except <br />those required by safety laws for the protection of personnel. <br />Pursuant to the authority contained in Section 591 of the Vehicle Code, the Department has <br />determined that, such areas as are within the limits of the project and are open to public traffic, the <br />Contractor shall comply with all the requirements set forth in Divisions 11, 12, 13, 14 and 15 of the <br />Vehicle Code. Attention is directed to the statement in Section 591 that this Section shall not <br />relieve him or any person from .the duty of exercising due care. The Contractor shall take all <br />necessary precautions for safe operation of his/her equipment and the protection of the public from <br />injury and damage from such equipment. <br />The Contractor is responsible for maintaining a safe and orderly job site per Occupational Safety <br />and Health Administration (OSHA) standards. <br />1.15 LICENSES & PERMITS <br />This section shall conform to Subsection 7-5 of the Standard Specifications and these Special <br />Provisions. <br />a. Business License, Each Prime Contactor, Subcontractor, Vendor shall obtain and pay for a <br />Santa Ana Business License. Detailed information concerning business license may be <br />obtained from the Finance and Management Services Agency, (714) 647-5447, City Hall, <br />b. Construction Water Permit. Each Prime Contractor or Subcontractor which desires to obtain <br />water from City -owned Lire hydrants for construction or any other purpose shall first obtain and <br />pay for a permit from the Corporate Yard of the City of Santa Ana, at 220 South Daisy Avenue. <br />Information concerning costs and conditions may be obtained from the City by calling (714) <br />647-3320. Use of private water from a hose bib is not allowed. <br />c. Disposal Permit. In accordance with the procedures of the Orange County General Services <br />Administration (GSA), the cost for the disposal of all materials at County landfill sites shall be <br />borne by the Contractor. <br />d. Bullding and Electrical Permits. For projects involving building, structural construction, traffic <br />sianal' or irrigation controller installation, the Prime Contractor shall obtain the necessary <br />Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.