My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLEMING INTERNATIONAL INC. - 2014
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2021
>
FLEMING INTERNATIONAL INC. - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 4:19:13 PM
Creation date
5/21/2015 12:57:42 PM
Metadata
Fields
Template:
Contracts
Company Name
FLEMING INTERNATIONAL INC.
Contract #
A-2014-273
Agency
FINANCE & MANAGEMENT SERVICES
Council Approval Date
10/21/2014
Insurance Exp Date
9/1/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
building and electrical permits from the Planning & Building Agency. There will be no fees <br />for these permits. <br />e. Fire Permits: All permits and fees required by all other Agencies having jurisdiction over any <br />part of the work shall be obtained and paid for by the Contractor, unless otherwise noted on the <br />Pians or in the Special Provisions, <br />1.16CLEAN-UP & DUST CONTROL <br />This Section shall conform to Subsection 7-8.1 of the Standard Specifications and these Special <br />Provisions <br />The Contractor shall keep the work site clean and free from rubbish and debris at the end of every <br />working day. <br />in addition, the Contractor shall be fully responsible for removing any 'graffiti placed on new <br />improvements or Contractor's equipment daily immediately at the start of the work day: Cost to <br />remove graffiti shall be included in other items of work and no additional compensation will be <br />allowed therefore. <br />1,17 PUBLIC CONVENIENCE & SAFETY' <br />This section shall conform to Subsection 7-10 of Standard Specifications and these special <br />provisions. <br />Local vehicular and pedestrian` access, Including ,access to driveways and businesses, shall be <br />maintained' stall times. <br />All signs shall be illuminated or reflectorized when they are used during hours of darkness. All <br />cones, pylons, barricades, or posts used in the diversion of traffic shall be reflectorized. <br />All signing, barricading and diversion of traffic shall be subject to the approval of the Project <br />Manager. The Contractor shall provide a telephone number at which the Contractor's <br />representatives can be reached should an emergency occur requiring replacement or relocation of <br />the required traffic devices. <br />Prior to the start of construction operations, the Contractor shall notify the Police and Fire <br />Departments of the City, giving the approximate starting date, completion data, and the name and <br />telephone number of responsible persons who may be contacted at any hour in the event of a <br />critical condition requiring immediate correction. <br />1.18 STATE DIVISION OF INDUSTRIAL SAFETY PERMITS <br />in accordance with Section 6500 of the; State Labor Code; permits are required for all excavations, <br />which are five feet or deeper, or for ail structures being built or demolished, which are more than <br />three stories high. <br />1.19 SUBCONTRACTING <br />This section shall conform to Section 2-3.1 of the Standard Specifications and these Special <br />Provisions. <br />City of Santa Ana RPP 13-064 <br />Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.