Laserfiche WebLink
_ SCOPE OF SERVICES & SCHEDULE <br />Statement of Proposals- Santa Ana Reglonat Transportation Centef ADA Improvements <br />Task 2: Design Development (50% plans): 1 week <br />The Design development phase will Involve development of plans based upon the information and <br />analysis gathered from Task 1 along with input we have gathered from the City. This stage Initiates the <br />development of design details for the final selected ADA accessible improvements, <br />This will be accompanied by a statement of probable cost for the selected improvements, (This would <br />be updated from the conceptual statement of probable cost from the initial design stage based on the <br />final selected Improvements chosen,) <br />The Dellverables from this task will include a 50% set of plans, draft outline specification and <br />"Opinion of Probable Cost'. <br />Task 3: Construction Documents (90% and 100% plans) and Entitlement: 2 weeks <br />GPa will develop the design information from Task 2 regarding the renovation including material <br />selections, demolition and reconstruction plans for the proposed accessible improvements. <br />Provide 90% plan review and submittal for entitlement <br />GPa will provided on updated Statement of Probable Costs based on refinements to the plans. <br />Construction Documents phase (CDs) will Include finalizing plans and specifications from the Design <br />Development phase. This Includes the provision of detailed drawings that will serve as the basis for both <br />bidding and construction by a general contractor. <br />Deliverables from this task shall include 90% and 100% plans, final technical specifications, <br />and a finalized "Opinion of Probable Cost <br />Flans: <br />Depending on the determined priorities of Issues within the Transportation Center based on our <br />review sessions with the City, plans may include but are not limited to some, of the following: <br />• Title Sheet <br />• Code Assessment sheet <br />• Site Plan, including: <br />• Surface parking lots <br />• Right of Way improvements <br />• Accessible Route of Travel <br />• Striping, signage and detailing, as required <br />• Parking Structure <br />o Plans <br />o Striping, signage and detailing, as required <br />+ Architectural <br />• Building Floor Plan <br />• Enlarged Restroom Plans <br />• Interior Elevations, as required <br />• Building Sections, as required <br />• Architectural Details, as required <br />Gillis -* Panichopm Architects, Inc. <br />25J -20 <br />a <br />Page 21 of 25 <br />