Laserfiche WebLink
Proposal Submission. <br />PC Deployment Services 15 -019 Proposal Submission <br />City or Sarni Ann Page 17 <br />• Clnis identitied ahead of time to <br />expedite due installations. <br />(b) There will often be custom <br />software installation that will need <br />to be clone. Poresannple, our City <br />Attorney's Office (CAC) uses very <br />specific software to perform theirjobs. <br />Each CAO PC will need to have <br />His software installed. We will trnin <br />the Vendors in each specific software <br />installation. <br />(9) Vet "ify that the user can recess <br />This is discussed in response to SOS 7 above <br />network drives and 611 n6tworked <br />printers: <br />(a) If the user rieeds'netw6Vlced <br />printers adile'd, the Vendors wl I <br />- <br />11CC63s \l We (with the•user's account) <br />and install any applicable printers <br />(1) if the printers are not available oil <br />Rosie, then they will need the IP of <br />the printer and will need to acid it as a <br />I local TCP/IP printer.' <br />b) Imaging Services <br />Intratek is willing and able to sloe the entire shipment ofthe City's <br />(1) The City will be purchasing PC's <br />Dell order in our secured, hrsured facility in Huntington Reach. We <br />from a pre - approved contract with <br />would also like to propose that this same facility be used as the <br />vendors, <br />imaging and staging area for the deployment. <br />(2) The City will create a base image <br />For the purchased PC's. <br />We also propose that we take the base image provided to as by the <br />(3) The City does not have the space <br />City, and use a high- speed, bit -level hard drive cloning system to <br />to store all 300 PC's. Options may <br />replicate that image onto the new Dell hard drives. <br />be storing at the Vendors location or a <br />phased deployment over 3 -5 months <br />Furthermore, we would like to perform a 24 -hour stress test on the new <br />with PC's being ordered in smaller <br />Dell systems, with the newly imaged hard drive inetuded in that <br />quantities and stored at City Hall where <br />testing, to ensure system reliability and functionality. It would be <br />we do have space to store 75 -100 PC's. <br />during this phase that the image can be verified as being successfully <br />(4) The City would like a proposal <br />installed on the new system, <br />on how the vendor could assist with <br />his irna ing and story e rocess. <br />c) Tuning ofdepfoymetit <br />The Intratek preliminary project timetable, included in this proposal, <br />(l) The aeploymeat of PC's is <br />outlines h6wthuprojectpr6gt6e sestowar Msnteethigor,urrpr'ovang, <br />expected to Started July_ 1, 20 (5 acid <br />upon IN December 1, 2015 co htletioti d'a'te <br />.is to be completed by December `1, <br />2015, with average of 25 36 PC's <br />deployed weekly, This is contni.ecnt <br />on shipments received and 'sto7age <br />roora availability. <br />d) Minimum Required Qualifications <br />tnn'atek will ensure that the technicians assigned to this project will <br />of Technicians: <br />exceed the experience expectations otrtlined by the City. This will be <br />(I) Minimum 3 years' experience with <br />evident in the technician's submitted resumes. <br />Windows XP and Windows 7 operating <br />systems <br />(2) Cepe•ience migrating user _data <br />PC Deployment Services 15 -019 Proposal Submission <br />City or Sarni Ann Page 17 <br />