Laserfiche WebLink
Page 2 of 17 HUD 52531A <br />Agreement, Part 1 of 2 <br />Previous Editions are obsolete <br />Project-based Voucher Program <br />EXHIBIT B: Description of work to be performed under this Agreement, including: <br />if the Agreement is for rehabilitation of units, this exhibit must include the <br />rehabilitation work write-up and, where the PHA has determined necessary, <br />specifications and plans. <br />if the Agreement is for new construction of units, the work description must <br />include the working drawings and specifications. <br />any additional requirements beyond HQS relating to quality, design and <br />architecture that the PHA requires. <br />work items resulting from compliance with the design and construction <br />requirements of the Fair Housing Act and implementing regulations at 24 CFR <br />100.205 and the accessibility requirements under section 504 of the Rehabilitation <br />Act of 1973 and implementing regulations at 24 CFR 8.22 and 8.23. <br />EXHIBIT C: Description of housing, including: <br />project site. <br />total number of units in project covered by this Agreement. <br />location of contract units on site. <br />number of contract units by area (size) and number of bedrooms and bathrooms. <br />services, maintenance, or equipment to be supplied by the owner without charges <br />in addition to the rent to owner. <br />utilities available to the contract units, including a specification of utility services <br />to be paid by owner (without charges in addition to rent) and utility services to be <br />paid by the tenant. <br />estimated initial rent to owner for the contract units. <br />EXHIBIT D: The HAP contract. <br />1.4 Significant Dates <br />A. Effective Date of the Agreement: The Agreement must be executed <br />promptly after PHA notice of proposal selection to the owner has been <br />given. The PHA may not enter this Agreement with the owner until any <br />required subsidy layering review has been performed and an <br />environmental review has been satisfactorily completed in accordance <br />with HUD requirements. <br />B. A project may either be a single-stage or multi-stage project. A single- <br />stage project will have the same Agreement effective date for all contract <br />units. A multi-stage project will have separate effective dates for each <br />stage. <br />4-5