Laserfiche WebLink
RESOLUTION 2015-027 <br />REVENUEFY 15-16 <br />ACCOUNTDEPARTMENT/MISCELLANEOUS FEE OR SERVICEUNITFEES <br />SECTION IXPLANNING & BUILDING AGENCY <br />Electrical Fees <br />$49.68 <br />51603 <br />165)Permit Issuance <br />$66.23 <br />51603 <br />166)Minimum Fee (Nonresidential) <br />53601 <br />167)Electrical Plan Check Fee (when required)65% of Subtotal <br />$1.31 <br />51603 <br />168)125 Volt Receptacle Outlets <br />$1.42 <br />51603 <br />169)Light Switches, Occupancy Sensors <br />$0.95 <br />51603 <br />170)Light Fixtures <br />$87.47 <br />51603 <br />171)Air Conditioners, Heat Pumps <br />$22.38 <br />51603 <br />172)Factory-Wired Units (Solid Hook-Ups) <br />$22.38 <br />51603 <br />173)Dedicated Circuits (15 or 20 AMP Receptacles) <br />$10.92 <br />51603 <br />174)Time Clock, Photo-Cell, Time Switch <br />Each 100 ft. <br />$22.38 <br />51603 <br />175)Track-Light, Cable Tray, Special Raceway, Plugmold, <br />or fraction <br /> Under-Floor Duct, Plug-In Busways, Wiremold, Etc. <br />thereof <br /> Service Meter, Reset Meter, Subpanel, Switchboard, Motor <br /> Control Center, Transfer Switch, Busduct, or other Distribution <br /> Equipment changes or mdofications. <br />$48.10 <br />51603 <br />176)Under 400 amperes <br />$131.14 <br />51603 <br />177)400 amperes to 1199 amperes <br />$218.50 <br />51603 <br />178)1200 amperes and over <br /> Motor, Transformer, Welder, Industrial Equipment, Oven, <br /> Rectifier, Generator, Surge Arrestor, Water Heater, Photovoltaic <br /> Panel or other Power Equipment. <br />$3.22 <br />51603 <br />179)0 to 1 HP, kW or kVA <br />$21.02 <br />51603 <br />180)Over 1 to 10 HP, kW or kVA <br />39 <br /> <br />