My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - STREETCAR MOU
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
07/07/2015
>
25C - AGMT - STREETCAR MOU
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2015 8:45:54 AM
Creation date
7/2/2015 4:12:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
7/7/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OCTA MEMORANDUM OF UNDERSTANDING NO. C -5 -3295 <br />5.3.4 Construction Support <br />OCTA agrees to compensate Santa Ana on a time and materials basis for <br />Construction Support for the duration of the Project construction. <br />Construction Support includes, but is not limited to, construction oversight, traffic <br />engineering, police services and other related activities. OCTA will provide the <br />necessary construction inspection and testing services for the Project. However, <br />the Parties agree that inspection on water main modifications is required to be <br />performed by the City as steward of the City's potable water supply. The <br />specifics and details of this inspection will be detailed in the Construction <br />Agreement. <br />Construction Support shall also include, on a time and materials basis, permit <br />compliance building inspection and testing related to the Streetcar System <br />Maintenance and Storage Facility site improvements and any other <br />improvements requiring building permits. <br />OCTA and Santa Ana shall cooperate in preparing the scope of work <br />descriptions for these services. The Parties shall develop a Construction <br />Support Work Plan during the development of the Construction Agreement. <br />5.3.5 Building and Street Work Permit Fees and Development Impact Fees <br />Permit Fees: OCTA, and /or its Contractor(s), shall not be charged for Santa <br />Ana's fixed -cost permit issuance fees for building and street work permits <br />deemed necessary for the Project. <br />OCTA shall pay on a time and materials basis for Planning and Building services <br />including but not limited to, Site Plan Review and grading, landscape, <br />mechanical, plumbing, electrical and building plan review costs associated with <br />the issuance of permits for the Streetcar System Maintenance and Storage <br />Facility site improvements and any other improvements requiring building <br />permits. <br />OCTA and its Contractor(s) shall pay on a time and materials basis for <br />construction oversight costs associated with the issuance of permits for site <br />improvements and improvements in the public right -of -way related to this project. <br />In addition, City costs for such services may be compensated through the various <br />Project agreements as defined in Sections 5.3.2 and 5.3.4 above. <br />Development Impact Fees: OCTA shall pay for City- adopted and third party <br />development impact fees such as water and sewer connections, among others, <br />which are related to site improvements for individual stations, maintenance <br />facilities and other similar structures supporting the Project. <br />25C -15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.