Laserfiche WebLink
As part of the final report, included in the data collection, indicator development, and <br />other tasks are detailed cost estimates for each deficiency. Each detailed cost <br />estimate shall be accessible via spread- sheets linked to the mapping being developed <br />as requested herein or available via GIS. Each location shall have sufficient <br />information such as construction quantities and unit costs so that based on a level of <br />priority or location of where improvements are desired, staff may readily compile a bid <br />sheet to advertise sidewalk and non - motorized connectivity improvements for <br />construction bids. <br />Task 9: raining : Train City staff in the use of the newly developed GIS tools, and in <br />maintaining the sidewalk and pedestrian amenities and inventory up to date. <br />The required products, which are to be delivered to the Traffic Engineering section of the City of <br />Santa Ana Public Works Agency, shall be as follows: <br />1. All data collection information for each street segment/intersection. <br />2. The draft SWC Report (electronic). <br />3. The final SWC Report (10 hard copies, one electronic). <br />All written reports, information, data, charts, tables, maps, drawings, etc, shall be in electronic <br />format acceptable to the City of Santa Ana. <br />SCHEDULE <br />This project is a high priority project for the City of Santa Ana Public Works Agency. The <br />proposal shall include a proposed project schedule for the milestones indicated below. The final <br />report and training should be completed within 125 calendar days of notice to proceed issuance. <br />Notice to Proceed: <br />Project Administration (Tasks 1) <br />Complete Field Review (Task 2) <br />Indicator Development & GIS Mapping (Tasks 3 -6) <br />Guidance (Tasks 7) <br />Submit SWC Draft Report (Task 8) <br />Submit SWC Final Report (Task 8) <br />Training (Task 9) <br />Attachment 1 - 3 <br />2501-15 <br />