Laserfiche WebLink
iii. Federal Financial Report (FFR) <br />Obligations and expenditures must be reported on a quarterly basis through the FFR <br />(SF -425) mud must be filed electronically using PARS. The form is available at <br />http:/ hvww .whitehouseggv /W(cs1dehu lt /f Ues/omblossets/trrants ornzs /SF- 42j,pd,, <br />An FFR report must be submitted quarterly throughout the period of performance, <br />including partial calendar quarters, as well as for periods where no grant award . <br />activity occurs. The final FFR is due 90 days after the end date of the performance <br />period. FFRs must be filed electronically through PARS. Future awards and fund <br />drawdowns may be withheld if these reports are delinquent, demonstrate lack of <br />progress, or are insufficient in detail. <br />iv. Program Performance Reporting Requirements <br />The following reporting periods and due dates apply: <br />Reporting Period <br />Report Due Date <br />January 1 -June 30 <br />July 30 <br />Judy 1 - December 31 <br />January 30 <br />.Performance Progress Report (SF -PPR) <br />Awardees are responsible for providing updated performance reports using the SF- <br />PPR (OMB Control Number: 0970 -0334) on abiannual basis. Grantees must <br />complete the cover page of the SF -PPR and submit it as an attachment to the 'NO <br />Grants system. The SF -PPR can be accessed online at <br />tt „: yww,na.fs.fed.ias/far)/SF -PPR Cover %205he . <br />et, d <br />Grantees will be required to report on progress towards implementing plans described <br />in their application, as well as, progress made towards implementing performance <br />measures as described in Appendix B - Program Specific Priorities. As part of the <br />SF -PPR, grantees will be required to report on progress towards implementing the <br />following performance measures: <br />• For fission centers, the achievement of capabilities and compliance with <br />measurement requirements within the Maturation and Enhancement of State and <br />Major Urban Area Fusion Centers priority through the annual Fusion Center <br />Assessment Program managed by the DHS Office of Intelligence and Analysis <br />(I &A) and reported to FEMA; and <br />Pass - Through Certification Requirement <br />For FY 2014, the Initial Strategy Implementation Plan (IS If) will no longer be <br />required, In place of the ISIP, the signatory authority of the SAA must certify in <br />writing to the respective FEMA GPD Program Analyst that the 80 percent (80 %) <br />pass - through obligation was met within 45 days of the award date. <br />Biannual Strategy Implementation Reports (BSIR) <br />In addition to the quarterly financial and biannual performance progress reports, <br />grantees are responsible for completing and submitting BSIRs. The BSIR is due <br />16 <br />FY 2014 HSGP FOA <br />55B -56 <br />