My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT - STREET TREE MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
07/07/2015
>
25B - AGMT - STREET TREE MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2015 8:45:34 AM
Creation date
7/2/2015 4:45:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
7/7/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
basin maintained at a grade of four (4) inches above the root flare of the <br />tree, <br />13. The Contractor shall be responsible for the stability of planted trees. The <br />nursery stake stall be removed from the trunk of the tree (as applicable) <br />and the tree shall be double staked using two (2), two (2) Inch lodge pole <br />stakes of a length sufficient to be installed beyond the depth of the <br />planting stock root ball and to extend to the upper branches of the <br />Installed tree's crown, The stakes shall be installed an equal distance <br />from the trunk of the tree and shall be Installed perpendicular to the <br />street or sidewalk and shall be installed so that one stake is orientated to <br />be one hundred eighty (180) degrees opposite the other. The root ball <br />shall not be damaged by the installation of stakes. The trunk of the tree <br />shall be attached to the stakes using City approved tree ties Installed as <br />per manufacturer's specifications. <br />(2) New Tree Care <br />New Tree Care consists of the Irrigation of young trees which have been installed <br />by the Contractor and the cultivation of new canopy coverage. <br />1. The Contractor shall comply with ail general specifications standards <br />_described herein <br />2, As stated previously herein, the Contractor shall Identify the location of <br />all utilities and private property landscape irrigation components prior to <br />the planting of any tree. The Contractor shall take all responsibility for <br />any damage that occurs during the planting of any tree. <br />3. The Contractor shall not use hoses, equipment or water from private <br />properties when watering parkway trees, <br />4. While performing tree watering, the Contractor shall maintain the tree <br />watering basin to Include the removal of weeds and debris and the <br />maintenance of the watering basin to size and grade standards defined <br />herein. <br />5. Trees shall be watered In such a manner that does not result in erosion <br />of the tree watering basin, splashing of parked vehicles or damage to <br />any of the tree's surroundings. Haphazard riggings and /or watering out of <br />the window from the cab of watering equipment will not be tolerated. <br />6, The Contractor shall maintain a daily log of trees watered. The log shall <br />list the tree watered by site. A printed copy of the log, which shall be <br />maintained in digital format, must accompany invoicing for tree watering <br />services by the Contractor. <br />E. ROOT PRUNING SPECIFICATIONS <br />(1) In an effort to minimize future damage to public sidewalks and curbs and gutters, <br />the City is initiating a root pruning and root barrier installation program. The <br />Contractor will be provided a listing of trees to be root pruned. The list shall <br />include the location of the tree, tree species, lineal feet to be root pruned and <br />area to be pruned such as sidewalk or curb and gutter. <br />25B -36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.