My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25L - AGMT - ON-CALL RIGHT OF WAY SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
08/04/2015
>
25L - AGMT - ON-CALL RIGHT OF WAY SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2015 10:29:01 AM
Creation date
7/30/2015 5:10:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25L
Date
8/4/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9.YfPf.TNP <br />4T.L i.F IC't <br />CL f t I P. 1zF4 <br />RFP No. 13-075 On -Call Right of Way Specialty Services <br />key tracking device in OPC's Right of Way Plan Is our right of way acquisition case management <br />system which holds all information about each parcel /interest and will be utilized to generate <br />status reports, offers, deeds, documents, and any requested project certification. A right of way <br />schedule will be utilized to monitor the completion of project milestone and the progress of <br />individual cases. <br />Preliminary Title Work. Early in design (usually In an earlier phase of project development), <br />OPC All secure ,preliminary title information consisting of the property profiles and Assessors <br />maps available from our subscription services. Once R/W Impacts are identified with certainty, <br />OPC will procure preliminary title reports from a local title company or the preferred title company <br />of the City, OPC also carafuity studies the existing use of the land and the ownership of adjacent <br />lands to ensure that we do not miss any "larger parcel" identifications involving commonly- owned <br />parcels not Impooted by tits project design. The title company will ultimately insure the title tothe <br />Pre - Appraisal Activities, Prior to ordering real estate appraisals on the needed interests, we will <br />carefully study the project (reeds to create an accurate scope of the .appraisal work. We will <br />identify variable items such as length of time for TCE's, whether the interests need to be staked <br />or not, preferred treatment of signs and improvements, what assumptions the apprafserwlll make <br />regarding soils conditions, larger parcel °determinations, etc. We will ensure that proper appraisal <br />maps artd construction drawings (likely at 65% complete) exist and that the legal descriptions and <br />plat maps are delivered to the appraiser for Inclusion in the report, In this phase, OPC will prepare <br />the acquisition filet; and present the property owner with preliminary information contained within <br />a Notice of Decision to Appraise including the City's acquisition policies and procedure$. <br />Acquisition and Negotiation. The Acquisition Package. OPC will receive and review the <br />completed appraisal, have it reviewed as necessary based on project funding, and secure <br />authorization from the City identifying the amount of just compensation to be offered. Using input <br />from our Project Development Guide and Acquisition 'Plan, OPC will craft Individual 'offer and <br />agreement packages for each needed ownership and have them signed by the City's authorized <br />representative prior to delivery. On projects with Federal funding requiring the,use of Caitrans <br />policies and procedures pursuant to a cooperative agreement, or for rights of way that will <br />ultimately be transferred to State ownership, OPC; will coordinate with'Caltrans Local Assistance <br />to ensure that our proposed agreement and deed formats comply with State policies. <br />NegptiaJiop§ witb t'e Fee Owner. Before presenting the offer, a trained in -house OPC acquisition <br />consultant will prepare for the negotiation by completing comprehensive review of all `title <br />reports and underlying record documents, reviewing the appraisal and engineering plans; legal <br />descriptions and right of way maps and other information relevant to the project, Our trained <br />negotiators will personally deliver all offers and negotiate in good faith the acquisition of the <br />Interest while keeping the Project Manager and the City informed of the status of the negotiation <br />along the way. <br />Negotiations will involve an interactive, face -to -face discussion with the property owner about <br />his/her property, explanation of the project and its impacts to the property; explanation of the <br />appraisal process and how the value was concluded, as well as answering any questions or <br />concerns the owners may have. All of our agents are licensed with the DRE and trained to utilize <br />a non - coercive, integrative negotiation style to overcome all hurdles in reaching a settlement in <br />the most efficient manner possible. Our agents will negotiate in good faith, with an open mind for <br />creative solutions that would be mutually beneficial to all parties involved. In the event a counter <br />25L -231 <br />
The URL can be used to link to this page
Your browser does not support the video tag.