TWINING
<br />Task
<br />Machining and Preparation of Tensile and
<br />Code
<br />Code
<br />Bend Sample: Carbon Steel
<br />20706
<br />Rate
<br />20751
<br />Machinist: Initial Preparation from Mock -up, Etc ,'$
<br />direction (ASTM D3039)
<br />80.00
<br />20707
<br />(Per Hour)
<br />$ 250.00
<br />Rate
<br />20753
<br />Sawcut to Overall Width (Per 0.5" Thickness or
<br />$
<br />40.00
<br />$ 85.00
<br />Fraction Thereof)
<br />(ASTM D3039)
<br />20755
<br />Machine to Test Configuration: Milled Specimens
<br />$
<br />55.00
<br />20783
<br />(Per 0.5" Thickness or Fraction Thereon
<br />$ 8200 ,
<br />Cyclic and Fatigue Testing Programs an Special Products/Pars
<br />20757
<br />Machine to Test Configuration: Turned Specimens
<br />$
<br />110.00
<br />(Per 0.5" Thickness or Fmction Thereof)
<br />20759
<br />Prepare Subaze Specimens (Per 0, 5" Thickness
<br />$
<br />72.00
<br />or Fraction Thereof)
<br />Fastener /Coupling Full Testing Program Per New Regulations: Tension,
<br />Quotation
<br />Task
<br />Code Charity Impact Rate
<br />20621 Charpy Impact Ambient Temperature, per sample $ 70.00
<br />(Average of 3 Samples Typically Required)
<br />20623 Charpy Impact Reduced Temperature, per sample $ 90.00
<br />(Average of 3 Samples Typically Required)
<br />Task
<br />Code
<br />Polymer Matrix Composite Materials (Fi hery rap)
<br />Rate
<br />20706
<br />Tensile Strength— Set of 5 Specimens /batch/
<br />$ 1,350.00
<br />direction (ASTM D3039)
<br />in the ceramic the industry. A separate schedule of fees for these services
<br />20707
<br />Tensile Strength— Additional Specimens
<br />$ 250.00
<br />Rate
<br />(ASTM D3039)
<br />20708
<br />Heating Chamber Time — Per 24 hr period
<br />$ 85.00
<br />(ASTM D3039)
<br />Task
<br />Code Calibration Services and Unive Mac
<br />rsal hine Usage_ Rate
<br />20801 CalibrationNerfication Services�� Quotation
<br />20803 Universal Test Machine Usage (Per Hour) $ 250.00
<br />Ceramic Tile 'resting Division
<br />General Conditions
<br />NOTE: Field inspection work conditions are established by contract with Operating Engineers, Local 12
<br />NOTE: A minimum [of 24 hours notice is required for testing and Inspection services
<br />Administrative Fees
<br />All administrative casts including report distribution and the Twining ConstructionHive system are billed at 4% of monthly invoice total. Note that hard copies of reports will be
<br />sent only to governing lursdictions that mandate them. All other parties will receive reports electronically. The administrative fee above will be increased by 1 %if additional hard
<br />copies of reports are requested.
<br />Minimum Charges (Inspection and Technician Personnel Only - Other Personnel Charged on Portal to Portal Basis)
<br />2 -Hour Minimum: Inspectorarrives atjobshe, no work to perform Inspectorarmers atfobslte, no work to perform
<br />4 -Hour Minimum: 1 to 4 hours of inspection 1 to 4 hours of inspection
<br />e -Hour Minimum: Over 4 hours of inspection Over hours of Inspection
<br />Regular Time
<br />The first 8 hours worked Monday through Friday between 5:00 a.m. and 5:00 am
<br />Time and One -Half (All Types of Inspection)
<br />All shifts will be billed based on the time and date of their star. Any incrament past 8 hours through 12 hours worked Monday through Friday and the first 12 hours on Saturday
<br />Time and one -half will also be charged for any time before 5:00 a.m. and after 5:00 ark
<br />Double Time (All Types of Inspection)
<br />All shifts will be billed based on the time and date of their start. After the first 12 hours worked Monday through Saturday, all day Sunday, holidays, and the first Saturday
<br />following the first Friday In June and December. Holidays are New Yeats Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the day after
<br />Thanksgiving, and Christmas Day.
<br />Meal Period
<br />When personnel are required by their duties to work more than five consecutive hours without a one -halt hour uninterrupted meal period,one half hour
<br />at double time rate will be charged in addition to any applicable overtime for actual hours worked.
<br />Shift Differential
<br />A $1.00 per hour shift differential premium will be charged for all inspection hours that fall outside of the 5:00 a.m. to 500 p.m. time period. Twining will require 48 -hour notice
<br />prior to beginning a shlit that will Include hours felling outside this time period. Should this notice not be provided, all work performed on that shift will be billed at the overtime
<br />rate.
<br />If three shifts per day are required, the first shift will be billed at the standard rate The second shift shall be billed In accordance with the previous paragraph.
<br />The third shift shall be billed at 8 hours for the first 61 /2 hours worked and overtime for all hours thereafter.
<br />25M -311
<br />The Ceramic Tile Institute of America (CTIOA) and Twining worked together to advance
<br />and develop technology designed to enhance the quality of materials and workmanship
<br />Task
<br />in the ceramic the industry. A separate schedule of fees for these services
<br />is available
<br />_Code
<br />Machining of Charpy Samples: Carbon Steel
<br />Rate
<br />upon request.
<br />20780
<br />Cutting and Mining (Per 0.5" or Fraction Thereafter)
<br />$ 7200 .
<br />(Average of 3 Samples Typically Required)
<br />20783
<br />Final Machining to Sample Configuration
<br />$ 8200 ,
<br />Cyclic and Fatigue Testing Programs an Special Products/Pars
<br />Quotation
<br />(Average of 3 Samples Typically Required)
<br />Engineering and Technical supports/Design of Prototypes and Special
<br />Quotation
<br />Task
<br />Fastener /Coupling Full Testing Program Per New Regulations: Tension,
<br />Quotation
<br />Code
<br />Prestressing Wires and Tendons, ASTM A416
<br />Rate
<br />Tension /Band, Shear, Double Shear, 8 Compressions
<br />20701
<br />Stress -Strain Analysls: Wire or Strands
<br />$ 170.00
<br />Fiberglass /Composite Materials Field Testing Program (ASTM D4085,
<br />Quotation
<br />(Including Chad and Percent Offset)
<br />DI 143, 04923, D2584, 04476, D1242, 07901, 07921, and D732)
<br />20703
<br />Tensile Test Only
<br />$ 125.00
<br />Field Testing of Structures and Structural Elements
<br />Quotation
<br />20705
<br />Tendons
<br />Quotation
<br />In -Place Shear Testing
<br />Quotation
<br />Materials and /or Product Evaluation Per Specifications
<br />Quotation
<br />Structural Dynamic Testing and Durability Analysis
<br />Quotation
<br />General Conditions
<br />NOTE: Field inspection work conditions are established by contract with Operating Engineers, Local 12
<br />NOTE: A minimum [of 24 hours notice is required for testing and Inspection services
<br />Administrative Fees
<br />All administrative casts including report distribution and the Twining ConstructionHive system are billed at 4% of monthly invoice total. Note that hard copies of reports will be
<br />sent only to governing lursdictions that mandate them. All other parties will receive reports electronically. The administrative fee above will be increased by 1 %if additional hard
<br />copies of reports are requested.
<br />Minimum Charges (Inspection and Technician Personnel Only - Other Personnel Charged on Portal to Portal Basis)
<br />2 -Hour Minimum: Inspectorarrives atjobshe, no work to perform Inspectorarmers atfobslte, no work to perform
<br />4 -Hour Minimum: 1 to 4 hours of inspection 1 to 4 hours of inspection
<br />e -Hour Minimum: Over 4 hours of inspection Over hours of Inspection
<br />Regular Time
<br />The first 8 hours worked Monday through Friday between 5:00 a.m. and 5:00 am
<br />Time and One -Half (All Types of Inspection)
<br />All shifts will be billed based on the time and date of their star. Any incrament past 8 hours through 12 hours worked Monday through Friday and the first 12 hours on Saturday
<br />Time and one -half will also be charged for any time before 5:00 a.m. and after 5:00 ark
<br />Double Time (All Types of Inspection)
<br />All shifts will be billed based on the time and date of their start. After the first 12 hours worked Monday through Saturday, all day Sunday, holidays, and the first Saturday
<br />following the first Friday In June and December. Holidays are New Yeats Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the day after
<br />Thanksgiving, and Christmas Day.
<br />Meal Period
<br />When personnel are required by their duties to work more than five consecutive hours without a one -halt hour uninterrupted meal period,one half hour
<br />at double time rate will be charged in addition to any applicable overtime for actual hours worked.
<br />Shift Differential
<br />A $1.00 per hour shift differential premium will be charged for all inspection hours that fall outside of the 5:00 a.m. to 500 p.m. time period. Twining will require 48 -hour notice
<br />prior to beginning a shlit that will Include hours felling outside this time period. Should this notice not be provided, all work performed on that shift will be billed at the overtime
<br />rate.
<br />If three shifts per day are required, the first shift will be billed at the standard rate The second shift shall be billed In accordance with the previous paragraph.
<br />The third shift shall be billed at 8 hours for the first 61 /2 hours worked and overtime for all hours thereafter.
<br />25M -311
<br />
|