My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25M - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
08/04/2015
>
25M - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2015 10:37:58 AM
Creation date
7/30/2015 5:17:08 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25M
Date
8/4/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® N ■ CITY OF SANTA ANA —.- On-Call Engineering Services - Part B RFP 14 -0376 <br />SCHEDULE <br />...................................................................................................... ............................... <br />The project schedule developed for the Privacy Walls Design project reflects the approach and the scope of <br />work detailed in the previous sections as well as assumed review period durations by the City of Santa Ana. <br />Our previous experience with similar projects demonstrated that the design can be completed in 11 weeks <br />from NTP. <br />Task Name <br />(Duration , tart ^W� <br />Pinish <br />8/5/15 <br />i <br />Task 2.3 Geotechnical Investigation and Report 3 wks <br />Wed <br />Notice to Proceed <br />1 day <br />Tue 8/4/15 <br />Tue 8/4/15 <br />Task 1. Project Management <br />11 wks <br />Wed 8/5/15 <br />Tue 10/20/15 <br />Task 2. Existing Data Gathering <br />15 days <br />Wed WAS <br />Tue 8/25115 <br />Task 2.1 Research Utility anti as -built records <br />2 wks <br />Wed 8/5/15 <br />Tue 8/18/15 <br />Task 2.2 Design Survey and ROW Mapping <br />2 Wks <br />Wed <br />8/5/15 <br />Tue 8/18/15 <br />Task 2.3 Geotechnical Investigation and Report 3 wks <br />Wed <br />8/5/15 <br />Tue 8/25/15 <br />- Task 3. Plans, Specifications and Estimate <br />45 days <br />Wed <br />8/19/15 <br />Tue 10/20/15 <br />Task 3.1- 65 %PS &E <br />2wks <br />Wed <br />8 /19/15 <br />Tue 9/1/15 <br />65% City review <br />2wks <br />Wed <br />9/2/15 <br />Tue 9/15/15 <br />Task 3.2- 95 %PS &E <br />1wk <br />Wed <br />9 /16/15 <br />Tue 9 /22/15 <br />95% City Review <br />2 wks <br />Wed <br />9/23/15 <br />Tue 10/6/15 <br />Task 3.3 -100% PS &E <br />i wk <br />Wed <br />10/7/15 <br />rue 10/13/15 <br />Final City Review <br />1 wk <br />Wed <br />10/14/15 <br />Tue 10/20/15 <br />MARK THOMAS K COMPANY 25M-419 <br />
The URL can be used to link to this page
Your browser does not support the video tag.