® CITY OF SANTA ANA On -Call EEnnglneeriin Services - Part B RFP 14 -0378 <br />SICOPF or, <br />y SCOPE WORK ITEMS <br />.................................................................................................... ............................... <br />R The following anticipated scope of work for the sample Provacy Wall project correlates to the technical <br />P approach and management approach described in the previous sections of this proposal. <br />! TASK 1: PROJECT MANAGEMENT/MEETINGS <br />! MTGo's Project Manager will take the lead in coordinating all project activities, including monthly <br />Meetings, including an initial kick -off meeting with the involved City of Santa Ana Staff. The meetings will <br />! be coordinated with the design submittal schedule to discuss any City comments and resolve any design <br />! issues. Meeting minutes will be prepared and sent to City for review /approval within five work days. <br />! Task 1 Deliverables: <br />MTCo will schedule, attend, and conduct a Kick -Off meeting with the City to review execution. <br />MTCo will schedule, attend, and conduct monthly meetings with the City throughout the performance of <br />i <br />the services. Three meetings are expected after the 65 %, 95 %, and 100% milestones, <br />TASK 2: PROJECT DATA GATHERING <br />MTCo will gather all relevant existing data, collect supplemental field topo and geotechnical information for <br />the design of the wall footing. This task shall include the following tasks and deliverables: <br />Task 2 Deliverables; <br />MTCo will attend one field coordination meeting with the City of Santa Ana staff. <br />MTCo will collect the property data, utility records and as- builts for the roadway to reference in the <br />development of the design. <br />• MTCo will use readily available georeferenced aerials topo, provided by the City or gathered from <br />commercially available sources such as Google earth, for the background of the layout plans. <br />• MTCo will conduct field survey for the project site to obtain elevation controls for the design of the wall <br />profile. Survey shall be at the wall layout line and also at a 5 and 10 foot offset on both sides of the <br />proposed wall layout line. <br />• Diaz Yourman and Associates shall conduct geotechnical borings three at the proposed wall <br />locationsand prepare a Geotechnical Design Report to provide MTCo with the recommended footing <br />design. <br />TASK 3 PLANS, SPECIFICATIONS AND ESTIMATE (PS &E) <br />Plans: Final Plans will be completed to allow for bidability and constructability of the Project. The format of <br />the plans will follow the City of Santa Ana CADD (Microstation V8i) and design standards. The proposed <br />height (16 feet max.) of the perimeter wall does not allow the use of the City's wall standards, in this case a <br />standard wall per Caltrans standard plans can be applied with the City's approval, this will avoid the design <br />of a custom wall type for this project. Anticipated sheets include the following; title sheet, quantities, and <br />typical section (1), Plan and Profile (1 " =20') (3), construction details (1). Total of five sheets anticipated. <br />Specifications: Technical specifications will be developed using the City of Santa Ana's most recent street <br />improvements provisions modified for this project and boilerplate specs provided by the City of Santa Ana, <br />Engineer's Cost Estimate: MTCo will prepare the Engineer's Cast Estimate for the quantities anticipated at <br />each milestone of the design phase, <br />Igs <br />3 Deliverables,' <br />• 65 %, 95% and 100% PS &E Submittals <br />• As -built plan revisions after construction has been completed. <br />oMARK THOMAS & COMPANY <br />25M -418 <br />