My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25M - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
08/04/2015
>
25M - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2015 10:37:58 AM
Creation date
7/30/2015 5:17:08 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25M
Date
8/4/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monica M. Suter, PE, TE, PTOE, City of Santa Ana <br />On -Call Engineering Services, Part B RFP no. 14 -0378 <br />Proposal for Civil Engineering Services <br />KPFF Job #314072.00 <br />June 18, 2016 <br />Page 6 <br />GEOTECHNICALAN'D (MOLOGICAL SCHEDULE OF CHARGES <br />C10AIR£NSA"noiw <br />Our cornpensatlon will be determined on the basis of One and expenses In accordance with the Poll Alln,g sdbeduto nrtlass <br />a fixed fee amount Is so indicated in the proposal or services. agreement. Conu'acted professional and technical services <br />will be charged at the applicable hourly rates as listed boloyr. Staff time spent to depositions, trial preparation, and vullrt or <br />hearing tcsl'amonyuvill be billed at 1,5 to 2 times the below rates. Time spent in eblhe'a local or Enter-city travel, when travel <br />is In the Interest of this contract, will be charged in accordance whit the'roregoing schedule; when traveling by Public <br />carrier, a maximum charge or eight hours per daywill be made, Curren[ rates are as foliaws: <br />PersonnelHourlyf4ate <br />Personnel <br />Support Staff $ 70 <br />Los Angeles Deputy Grading Inspector <br />Project Assistant $ 82 <br />Techltltal Specialist I <br />Senior Project Assistant $ as <br />Technical Spedallst II <br />'fechnielan 1 $ 75 <br />Senior 'tor[nical5peclxhsa <br />'Technician 11 $ 86 <br />Pr•o)ect <br />manager I <br />. Senior Technician $ 92 <br />Project <br />manager fl <br />. CAD $ 92 <br />Senior Project Manager <br />Staff I - S 96 <br />Associate <br />Staff 11 $ 110 <br />Senior Assodma <br />Staff 111 $121 <br />Principal <br />Equipment <br />Air compressor. gonetatOr (per day) <br />Cement amending field tool <br />Cement scale and pan (per day) <br />Core drill (per day) <br />Crass-hole sonic logger (CSQ (per day) <br />lalgltal Comore (per day) <br />[Frilled sbaltinspection camera(OSIQ (per day, inaxim[un 51,785 <br />Iron week} <br />Field Callfurnia bemiring ratio ION equipment [per day) <br />falling 'wcight dellectame[mr OPWD) (per day) <br />FaIling wel,ght defleaGsmeter t `WV) With CPR fl er dayy <br />Global poslttoninp system (CPS) - dlfferentlal (per day) <br />Global positioning system (GP5) - hand -held (per day) <br />Ground penetrating radar (13PR) - band,pushed (per day) <br />• Ground penetrating radar (GPR) - truck- inounted timer day) <br />Hand auger (per day) <br />Flydroacovstic Mot }haring Equipment. (per day) <br />- Nuclear density gauge equlprnent (per hour) <br />Pile driving anali WDA) (per day) <br />Pile liategrity tester iper day) <br />• Resistivity motor (per day) <br />. Slope Inclinometer equipment [furcasing) <br />Soil aanlplas in brass or stainless sleeves (per sample) <br />Stull samples in rings (persample) <br />• Specially software IJMO nFLt)W, PLMIS, Slope/65r, etc., per hour) <br />Total'. Station - Survey l:qulpinent (per hour„ maximum 3400 per day) <br />Will& toompany) usage (full day plus $0.63 per inile charge) <br />Ve'hido ipersanai) Llsage (per Milo) <br />Vibrating wire pieznineter <br />Vibration monitoring equipment (per day, inax €mum $265 perweek) <br />Hourly Mate <br />$ 97 <br />$131 <br />$145 <br />519d <br />$140 <br />$149 <br />$159 <br />$174 <br />$185 <br />$203 <br />Rate <br />S 53 <br />S 21 <br />5 76 <br />$ 210 <br />$ 473 <br />$ 69 <br />$ 945 <br />$ 131 <br />11,780 <br />$ 3,040 <br />$ 100 <br />S 3'0 <br />$ 525 <br />S I ,260 <br />$ 37 <br />S 263 <br />$ 11 <br />$ 52S <br />$ 210 <br />$ 105 <br />5 79 <br />$ 11 <br />$ 11 <br />$11.53 <br />$ 53 <br />$ 21 <br />$ 0.63 <br />$ 525 <br />$ 55 <br />Roproducllon Black/'Whito Color <br />a% x l I(perilalshed page) 'S033 $ 117 <br />11xII (per fheishedpmge) $013g S 1.58 <br />G or d•size plats (black /while avid color • per finished plot) $25.25 <br />V -size scan $12.60 <br />OTHER SERVICES, SUPPLIES, AND SPECIAL TAXES <br />Outside servlcas (equlprrienP, supplies, and facilities not furnished to accordance w th the above s- claedule, and any unusual <br />itcons of expense not customarily incurred in our normal operations) are charged at cost plus 12 percent. This Includes <br />shipping tbargus, subsistence, unulsporratian, printing and supplies and renrais, surveyyng <br />services, drilling equipment, construction equipment, watercraft, aircraft, and special Insurance that may ice reclulmd, <br />Speclahzed equipment wRl he quoted an a per-job basis, in -house disposable field supplies (routinely used field supplies <br />stocked rn�house by GaoGasrgn) at current rates, List avaifabo upon request. Taxes rag[arad by local Jurisdictions for <br />projects in specific geographic areas will 'be charged to larojects at direct cost. All rates are subject to charge upon <br />noilflcafion. <br />25M -492 <br />
The URL can be used to link to this page
Your browser does not support the video tag.