My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25M - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
08/04/2015
>
25M - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2015 10:37:58 AM
Creation date
7/30/2015 5:17:08 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25M
Date
8/4/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
°!J <br />The privacy wall project will initiate with a meeting with the City of Santa Ana and all <br />required consultants during which the project scope of services, schedule and fees will be <br />established. Once the project scope and fees are confirmed and the team is authorized <br />to proceed, a kick -off meeting will be scheduled in order to bring the design team together <br />to review the scope of services, project approach and schedule with the City for <br />verification of project goals and expectations and to establish any milestone submittal or <br />review deadlines. Determination of any public outreach needs will be established. <br />Survey of the project site and geotechnicai field work will be scheduled and executed <br />while a search for any available existing documents for utilities and public right -of -way <br />improvements will be conducted. Site visits for consultants to review the existing site <br />conditions will be scheduled. <br />Appendix <br />the foundation design parameters. The survey information will provide information <br />Sample Task Order Narrative <br />We understand the sample task order to be an 800 LF privacy wall height varying from <br />10 -16 feet of exposed height where private property (homes) abut the one side of the wall <br />and public right -of -way abuts the other side of the wall. Based on this description, it is <br />assumed that there is no need for lighting or power, landscaping, or disciplines other than <br />outlined below. <br />The privacy wall project will initiate with a meeting with the City of Santa Ana and all <br />required consultants during which the project scope of services, schedule and fees will be <br />established. Once the project scope and fees are confirmed and the team is authorized <br />to proceed, a kick -off meeting will be scheduled in order to bring the design team together <br />to review the scope of services, project approach and schedule with the City for <br />verification of project goals and expectations and to establish any milestone submittal or <br />review deadlines. Determination of any public outreach needs will be established. <br />Survey of the project site and geotechnicai field work will be scheduled and executed <br />while a search for any available existing documents for utilities and public right -of -way <br />improvements will be conducted. Site visits for consultants to review the existing site <br />conditions will be scheduled. <br />During the construction, established meetings will be conducted to assist the contractor <br />with any interpretation of the documents, review of construction progress and review of <br />pay applications from the contractor as needed. As -built documentation from the <br />contractor will be incorporated into the construction documents and provided to the City <br />as Record Documents. <br />On -Call Engineering Services — Part B - RFQ no. 14 -0378 <br />25M -493 kPff <br />Foundation design information from the geotechnical engineer's soils report will establish <br />the foundation design parameters. The survey information will provide information <br />needed to establish the top of wall, finish grade and top of footing elevations for the <br />length of the wall. A review of the City Standard Plans for applicability to the project will <br />be conducted and incorporated as appropriate. The structural design of the,privacy wall <br />and foundations will be developed. A drawing package will be developed with general <br />notes, plans, elevations and details for the construction of the wall based on the City CAD <br />standards. Civil drawings establishing wall location, easements, existing utilities, <br />drainage and grading information will be developed, Specifications for the project will be <br />assembled along with the General Conditions from or in conjunction with the City's <br />Supplemental Conditions. An estimate of the construction costs will be developed based <br />on the drawing information and utilizing the City Schedule of Values or a Schedule of <br />Values acceptable to the City. <br />During the construction, established meetings will be conducted to assist the contractor <br />with any interpretation of the documents, review of construction progress and review of <br />pay applications from the contractor as needed. As -built documentation from the <br />contractor will be incorporated into the construction documents and provided to the City <br />as Record Documents. <br />On -Call Engineering Services — Part B - RFQ no. 14 -0378 <br />25M -493 kPff <br />The document package will be provided to the City prior to submission for plan review for <br />confirmation the project goals have been addressed. Documents will be provided to the <br />City for plan review and any comments will be resolved so that the documents can be <br />approved for construction. Assistance with bidding the documents and facilitating a pre - <br />bid meeting with potential contractors will be conducted. Once the bids have been <br />reviewed and evaluated by the City and the contract awarded to the successful <br />contractor, a construction kick -of meeting will be facilitated during which the design team, <br />City and contractor will confirm chain of communication, project revision processes, <br />inspection requirements and as -built documentation. <br />During the construction, established meetings will be conducted to assist the contractor <br />with any interpretation of the documents, review of construction progress and review of <br />pay applications from the contractor as needed. As -built documentation from the <br />contractor will be incorporated into the construction documents and provided to the City <br />as Record Documents. <br />On -Call Engineering Services — Part B - RFQ no. 14 -0378 <br />25M -493 kPff <br />
The URL can be used to link to this page
Your browser does not support the video tag.