Laserfiche WebLink
It is important to note that the City of Santa Ana is not the first municipality in SCE's territory to commence the <br />acquisition process. As such, the City can benefit from the fact that SCE is becoming more accustomed to this <br />process, which increases the likelihood that the City of Santa Ana will have a streamlined experience. Further, <br />in Tanko Lighting's experience, most recent acquisitions in California (including the City of Richmond just a few <br />months ago) have not necessitated any outside legal resources and merely relied on internal legal staff to <br />complete the acquisition process. Thus, Tanko Lighting does not anticipate the need for any additional <br />subcontractors. However, should the acquisition process for some reason become more complicated and /or <br />contentious, Tanko Lighting will work with qualified legal partners with experience in municipal street light <br />acquisitions to bring additional resources to the project (at an added cost). <br />Phase 5: Streetlight Conversion Proiect Support <br />Task 9: Conversion Support <br />Tanko Lighting will provide technical and logistical support to City staff during the implementation of the retrofit <br />project, including GPS verification and fixture installation. Specifically, Tanko Lighting's support will include the <br />following elements: <br />Stakeholder Outreach <br />Tanko Lighting believes that proper coordination of information and outreach to stakeholders is an <br />essential part of ensuring a successful street light conversion project. To that end, Tanko Lighting will <br />coordinate with the City to develop a communication plan prior to the commencement of any conversion <br />activities. The strategy will: <br />• Develop appropriate project messaging <br />• Provide a press release outlining the project's elements and benefits <br />• Provide language and Frequency Asked Questions about the project for inclusion in the City's <br />relevant website pages <br />• Utilize the City's existing social media, public relations channels, and electronic media to <br />broadcast the project information. This will ensure speedy message delivery and eliminate need <br />for printed materials, thereby reducing cost and waste <br />• Logistics Management <br />Tanko Lighting will ensure that all logistics are carefully coordinated for the LED conversion phase. Tanko <br />Lighting will ensure proper communication and coordination with installation crews and will coordinate <br />pre - construction meetings and regular progress meetings with City staff and the installation contractor. <br />Additionally, Tanko Lighting will equip installation crews with the similar devices that are used in the initial <br />audit. Installers will utilize these devices to track the specific characteristics of daily installations, including <br />confirmed pre- and post - installation wattage, compliant labeling and badging issues, pole number, and <br />verified voltage prior to installation. Tanko Lighting will also provide installation maps showing street light <br />locations and replacement fixtures to be installed to help direct installation crews and assist City <br />inspectors with accurate project tracking. Tanko Lighting will provide the City with a Weekly Installation <br />Report (see sample report in Appendix C) with the locations and characteristics of the new LED fixtures <br />installed. <br />Task 2: Installation Data Reconciliation <br />Tanko Lighting will utilize the data collected during the installation process and compare it with the audit data to <br />verify that all relevant locations were converted. This process will also identify any punch -list items and Tanko <br />Lighting will continue to coordinate with the installation contractor to ensure that the final data set is accurate <br />and complete. Tanko Lighting will provide the City with a complete commissioning report outlining any errors <br />and actions taken to correct errors. <br />Task 3: Rebate, Rate Change & Incentive Coordination <br />Tanko Lighting will comply with all requirements to ensure replacement LED luminaires receive any available <br />utility rebates, rate changes and any incentives (including greenhouse gas credits). Tanko Lighting will maintain <br />close and ongoing communication with SCE to obtain status updates on submitted rebate applications and <br />Tanko Lighting Statement of Qualifications — City of Santa Ana — RFP #15 -058 Page 21 of 28 <br />25N -17 <br />