My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25N - AGMT - STREET LIGHT SYS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
08/04/2015
>
25N - AGMT - STREET LIGHT SYS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2015 10:38:31 AM
Creation date
7/30/2015 5:20:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25N
Date
8/4/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
It is important to note that the City of Santa Ana is not the first municipality in SCE's territory to commence the <br />acquisition process. As such, the City can benefit from the fact that SCE is becoming more accustomed to this <br />process, which increases the likelihood that the City of Santa Ana will have a streamlined experience. Further, <br />in Tanko Lighting's experience, most recent acquisitions in California (including the City of Richmond just a few <br />months ago) have not necessitated any outside legal resources and merely relied on internal legal staff to <br />complete the acquisition process. Thus, Tanko Lighting does not anticipate the need for any additional <br />subcontractors. However, should the acquisition process for some reason become more complicated and /or <br />contentious, Tanko Lighting will work with qualified legal partners with experience in municipal street light <br />acquisitions to bring additional resources to the project (at an added cost). <br />Phase 5: Streetlight Conversion Proiect Support <br />Task 9: Conversion Support <br />Tanko Lighting will provide technical and logistical support to City staff during the implementation of the retrofit <br />project, including GPS verification and fixture installation. Specifically, Tanko Lighting's support will include the <br />following elements: <br />Stakeholder Outreach <br />Tanko Lighting believes that proper coordination of information and outreach to stakeholders is an <br />essential part of ensuring a successful street light conversion project. To that end, Tanko Lighting will <br />coordinate with the City to develop a communication plan prior to the commencement of any conversion <br />activities. The strategy will: <br />• Develop appropriate project messaging <br />• Provide a press release outlining the project's elements and benefits <br />• Provide language and Frequency Asked Questions about the project for inclusion in the City's <br />relevant website pages <br />• Utilize the City's existing social media, public relations channels, and electronic media to <br />broadcast the project information. This will ensure speedy message delivery and eliminate need <br />for printed materials, thereby reducing cost and waste <br />• Logistics Management <br />Tanko Lighting will ensure that all logistics are carefully coordinated for the LED conversion phase. Tanko <br />Lighting will ensure proper communication and coordination with installation crews and will coordinate <br />pre - construction meetings and regular progress meetings with City staff and the installation contractor. <br />Additionally, Tanko Lighting will equip installation crews with the similar devices that are used in the initial <br />audit. Installers will utilize these devices to track the specific characteristics of daily installations, including <br />confirmed pre- and post - installation wattage, compliant labeling and badging issues, pole number, and <br />verified voltage prior to installation. Tanko Lighting will also provide installation maps showing street light <br />locations and replacement fixtures to be installed to help direct installation crews and assist City <br />inspectors with accurate project tracking. Tanko Lighting will provide the City with a Weekly Installation <br />Report (see sample report in Appendix C) with the locations and characteristics of the new LED fixtures <br />installed. <br />Task 2: Installation Data Reconciliation <br />Tanko Lighting will utilize the data collected during the installation process and compare it with the audit data to <br />verify that all relevant locations were converted. This process will also identify any punch -list items and Tanko <br />Lighting will continue to coordinate with the installation contractor to ensure that the final data set is accurate <br />and complete. Tanko Lighting will provide the City with a complete commissioning report outlining any errors <br />and actions taken to correct errors. <br />Task 3: Rebate, Rate Change & Incentive Coordination <br />Tanko Lighting will comply with all requirements to ensure replacement LED luminaires receive any available <br />utility rebates, rate changes and any incentives (including greenhouse gas credits). Tanko Lighting will maintain <br />close and ongoing communication with SCE to obtain status updates on submitted rebate applications and <br />Tanko Lighting Statement of Qualifications — City of Santa Ana — RFP #15 -058 Page 21 of 28 <br />25N -17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.