Laserfiche WebLink
Financing /Funding Overview Report: A report providing additional sources of funding, including grants and <br />rebates, available to the City. <br />Financing Overview Report: A report providing several financing options to support the project. <br />Phase 4 Deliverables <br />• Relevant Technology Recommendations: A report providing recommendations and technical support <br />identifying appropriate energy efficient technology (LED or approved equal) and relevant control technology <br />to retrofit existing street lights, including detailed cost estimates. <br />• Replacement Plan: A plan providing the recommended replacement fixtures for the existing luminaires. <br />• Ownership Transfer Strategy: Documentation of the recommended strategy to transfer ownership of the <br />street lights. <br />Phase 5 Deliverables <br />• Stakeholder Outreach Materials: Relevant messaging and draft materials (such as press release and <br />Frequently Asked Questions) to support the City's outreach efforts. <br />• Weekly Installation Report: A detailed listing of the locations completed during the installation phase, along <br />with maps corresponding to locations. <br />Rebate and Tariff Change Documentation: A compilation of copies of paperwork submitted and processed <br />with the utility regarding any applicable rebate applications and tariff changes. The information will also <br />include reports on any issues that arose during the process and actions taken to correct the issues. <br />• Commissioning Report: Detailed analysis of final installation verification and testing, including an outline of <br />any errors and actions taken to correct errors. <br />• Final Report: A final project report that will include all documentation requirements, including final utility <br />rebate and rate change requirements, as -built documentation and maps of completed project and pre- and <br />post - construction electronic GIS records. <br />• Maintenance Agreement Options: A report detailing several maintenance agreement options for long or <br />short term maintenance of the newly acquired and existing streetlight systems. <br />• Maintenance GPS Data: Ongoing GIS records based on fieldwork captured to track and monitor the street <br />light system. <br />• Over /Under -Lit Recommendations: A report of options regarding how to remedy any under or over -lit areas <br />meeting minimum safe night -time lighting standards. <br />Schedule <br />Because the acquisition process with SCE is still being determined by the initial municipal participants, it is <br />difficult to provide an initial schedule for the entire project with any certainty, as there are many elements outside <br />of Tanko Lighting's control. However, Tanko Lighting will streamline tasks so as to expedite the process and <br />enable the City to commence energy savings as soon as possible. Below is a table with a preliminary schedule <br />of how Tanko Lighting believes the project could progress: <br />Tanko lighting Statement of Qualifications —City of Santa Ana — RFP 1115 -053 Page 23 of 28 <br />25N -19 <br />