My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
32C - PARCEL MAP - 1540 E WARNER
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
08/04/2015
>
32C - PARCEL MAP - 1540 E WARNER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2015 10:46:49 AM
Creation date
7/30/2015 5:41:01 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
32C
Date
8/4/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tentative Parcel Map No. 2015 -01 <br />Special Use Permit No. 2015 -01 <br />July 13, 2015 <br />Page 4 <br />Setbacks — SD -8 zoning requires a 20 -foot front setback along private streets and a 10 -foot side yard <br />and 10 -foot rear yard setbacks. The Brookhollow Showroom Center was constructed in 1978 in <br />compliance with these setback requirements identified in the SD -8 zoning district. <br />Design Guidelines — The Brookhollow Showroom Center complies with the city's design guidelines. A <br />comprehensive building fagade improvement was completed in August 2014. The parking area was <br />repaved and restriped in April 2015. <br />Landscape — SD -8 zoning requires minimum landscape coverage of 15 percent. The Brookhollow <br />Showroom Center was constructed in 1978 in compliance with the landscape requirements identified <br />in the SD -8 zoning district. Maintenance of the landscaped areas is the responsibility of the master <br />association and the Covenants, Conditions and Restrictions (CC &R's). <br />Additionally, Section 41 -1805 of the SAMC requires separate meters for the units. The metering <br />includes electric, gas and water service for each unit and the common area. The project site currently <br />has separate meters for electric and gas for each unit. There is a hardship found to separate the <br />water service for each unit. As a result, the Public Works Agency agreed to waive the requirement to <br />have separate water meter for each unit. <br />Special use permit requests are governed by Section 41 -1807 of the SAMC. Special use permit <br />requests may be granted when it can be shown that the following can be established: <br />m The proposed common interest development will not adversely impact the economic viability of <br />large -scale commercial and industrial uses in the vicinity of the development, or in the city as a <br />whole. <br />The proposed common interest development includes sufficient provisions for governance, <br />funding and capitalization, and enforcement mechanisms to insure that the common area <br />continues to be adequately and safely maintained and repaired for the life of the common interest <br />development. <br />The proposed common interest development includes sufficient provisions for the retention of <br />such common areas for the use of all owners of separate interest therein. <br />• The proposed common interest development complies with the goals, policies and objectives of <br />the city's general plan. <br />If these findings can be made, then it is appropriate to grant the special use permit. Conversely, <br />the inability to make these findings would result in a denial. Using this information staff has <br />prepared the following analysis, which, in turn forms the basis for the recommendation contained in <br />this report. In analyzing the special use permit request, staff believes that the following findings of <br />fact warrant approval of the special use permit. <br />32C -6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.