Laserfiche WebLink
Count, of Orange, OcPaWle Work MA- 08049011193 <br />United Smr n Wang, lie. <br />Overflow or bypass flow capacity of the equipment when full of trash and overflowing (x. , <br />storage capacity of the equipment whin the one-year, one hour storm is an longer fully <br />f bustd) (if applicable). <br />- Maximum overflow or bypass flow capacity of the device (La., 19 -year storm event) (if <br />applicable). <br />- Device performance effectiveness in terms of pounds of trash removed per total project cast <br />(see Section V„ F.) <br />C. Siting, Operation, stud "alntavance <br />Description of Contractor's installation proem laeluding consultation mad review of device <br />locations with municipal staff, traffic control during installation, and estimated time required <br />to install each device. <br />Description of the site.spe&flc manswemanta and other information a municipality must <br />provide the Contractor for determining fin appropriate sits and conflgumtion of the device <br />for that location (i.e. Aiigible entities will need to determine how to select the right device for <br />their desired location). <br />A discussion of any regulatory permits that may be required for installation. <br />Maintenance regolrements (describe in detail how the device must be maintained and the <br />approximate amount of 4me required for closeted or maintenance, In addition, discuss <br />whether the device has design capabilities for easy numeral for cleaning or maLttenaoca }. <br />Bsdmated life cycle costs for maintenance, <br />Durability against extemal factors, such as street sweeping, car parking, etc, <br />Availability of replacement parts and life expecmney. <br />Warm arty coverage and duration. <br />Acedrefies and aatN.y, <br />-- Any key factors thatmakes the device unique among otherpreducts. <br />D. Contractor's Installation Background <br />- Ability of Contractor to have staff and/or subcontractors) to manufacture device and provide <br />butaltadon to eligible entities within Orange County, <br />F.xporience, background, training, and number of staff and/or subconhactor(s) who will fabricate <br />and/or install device. <br />E. Operating Locations, References, and Certiffeations <br />- A minhnum of three locations, inclusive of address or nearest intersection, and photos of <br />device in operation within southern California, preferably Orange County. <br />Certifications obtained *am public agencies and /or Rcgloaal Water Quality Control Boards. <br />P03019 Page <br />16 af10 <br />22 <br />