My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE, COUNTY OF (39) - 2015
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, COUNTY OF
>
ORANGE, COUNTY OF (39) - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:58:16 AM
Creation date
8/19/2015 1:12:41 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE, COUNTY OF
Contract #
A-2015-130
Agency
Police
Council Approval Date
7/7/2015
Expiration Date
8/31/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAMPAIGN PL AWS oPmRAc"i1C'IAlAL CYCLE <br />DURA'TIOW 1' FISCAL` JEAtR <br />FY ^aNdEf <br />FY and <br />2: Example of a Dvnamic. Unsvnchronizeri nnurarinnal r „pis <br />III. Reporting Procedures <br />Participation in OPSG requires accurate, consistent, and timely reporting of how funds are used, <br />and how the State, local and Tribal agencies' operations have impacted border security through <br />the mitigation of threat or vulnerability and the overall reduction of risk. Reporting will focus <br />on: monitoring program performance; determining the level of integration and information <br />sharing; and developing best practices for future operations. To ensure consistent reporting each <br />State, local and Tribal agency wiE identify a single point of contact to represent their agency as a <br />member of the £PT and to coordinate the submission of reports or execute other aspects of the <br />grant. <br />Attachment A, the Daily Activity Report is to be used to submit the ongoing results and outputs <br />from OPSG operations conducted. The Daily Activity Report will be submitted to the BP sector, <br />if required, or to the participating agency's OPSG coordinator, The agency coordinator will <br />compile the results from each Daily Activity Report: at the end of the month and submit a <br />monthly report to the BP sector. The monthly report is due to sector by the 10`h clay of the <br />following month. The BP sector will compile the results from the participating agencies and <br />submit the results to BP Headquarters by the 15`h of each following month. <br />In addition to the ongoing reporting of outputs, participants will be required to submit After <br />Action Reports to participating agencies and the BP within 10 days of any completed operation, <br />after convening a debrief meeting. The After Action Report should carefully articulate outcomes <br />and outputs, as well as how the results of the operation compare with the objectives identified <br />79 <br />Appendix E — FY 2014 HSGP, OPSG Operational Guidance <br />
The URL can be used to link to this page
Your browser does not support the video tag.