My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - SOLAR PERMITTING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
09/01/2015
>
75A - PH - SOLAR PERMITTING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2015 6:04:05 PM
Creation date
8/26/2015 4:52:18 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
9/1/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(c) Eligibility. <br />The Building Department shall adopt a standard plan and checklist <br />of all requirements which small residential rooftop solar energy <br />systems shall comply with to be eligible for expedited review. <br />2. The small residential rooftop solar system permit process, <br />standard plans, and checklist shall substantially conform to the <br />recommendations for expedited permitting, including the checklist <br />and standard contained in the most current version of the <br />California Solar Permitting Guidebook adopted by the Governor's <br />Office of Planning and Research. <br />3. Prior to submitting an application, the applicant shall: <br />Verify to the City's reasonable satisfaction through the use of <br />standard engineering evaluation techniques that the support <br />structure for the small residential rooftop solar energy system <br />is stable and adequate to transfer all wind, seismic, and dead <br />and live loads associated with the system to the building <br />foundation. <br />At the applicant's cost, verify to the City's reasonable <br />satisfaction using standard electrical inspection techniques <br />that the existing electrical system including existing line, load, <br />ground and bonding wiring as well as main panel and <br />subpanel sizes are adequately sized, based on the existing <br />electrical system's current use, to carry all new photovoltaic <br />electrical loads. <br />(d) Review/ Issuance Process. <br />1. An application that satisfies the information requirements in the <br />checklist pursuant to Section (c)(2) above, shall be deemed <br />complete. Upon receipt of an incomplete application, the building <br />official shall issue a written correction notice detailing all deficiencies <br />in the application and any additional information required to be <br />eligible for expedited permit issuance. <br />2. Upon confirmation by the building official of the application and <br />supporting documentation being complete and meeting the <br />requirements of the checklist, the building official shall <br />administratively approve the application and issue all required <br />permits. <br />3. City building permit approval does not authorize an applicant to <br />connect the small residential rooftop energy system to the local <br />Page 2 <br />75A -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.