Laserfiche WebLink
utility provider's electricity grid. The applicant is responsible for <br />obtaining such approval or permission from the local utility provider. <br />(e) Inspections. <br />For a small residential rooftop solar energy system eligible for <br />expedited review, only one inspection shall be required. <br />If a small residential rooftop solar energy system fails inspection, a <br />subsequent inspection is authorized; however the subsequent <br />inspection need not conform to the requirements of this subsection. <br />Page 3 <br />75A -5 <br />