My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - CONCRETE IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
09/01/2015
>
23A - PROJ - CONCRETE IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2015 5:55:09 PM
Creation date
8/27/2015 3:24:10 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
9/1/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />SEPTEMBER 1, 2015 <br />TITLE: <br />AWARD CONTRACT FOR CITYWIDE <br />CONCRETE IMPROVEMENTS <br />(PROJECT 166849) <br />(STRATEGIC PLAN NOS. 6, 1B, 1C & 1G) <br />CITY MANAGER <br />RECOMMENDED ACTIONS <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />❑ As Recommended <br />❑ As Amended <br />❑ Ordinance on tat Reading <br />❑ Ordinance on 2ntl Reading <br />❑ Implementing Resolution <br />❑ Set Public Hearing For <br />CONTINUED TO <br />FILE NUMBER <br />1. Reject the sole bid received on July 8, 2015, from Excel Paving Company (EPC) in the <br />amount of $900,000 for the construction of the Citywide Concrete Improvements. <br />2. Authorize the City Manager and the Clerk of the Council to execute a construction contract to <br />Ruiz Concrete & Paving Inc., the lowest responsible bidder, in accordance with the Base Bid, <br />totaling $607,095, for the construction of the Citywide Concrete Improvements, subject to <br />nonsubstantive changes approved by the City Manager and the City Attorney. <br />3. Approve the Project Cost Analysis for a total estimated project delivery cost of $789,155 <br />DISCUSSION <br />Awarding a construction contract to Ruiz Concrete & Paving, Inc., will allow the City to proceed <br />with the Citywide Concrete improvements which are part of the Fiscal Year 2014 -15 Capital <br />Improvement Program. This project includes replacement of damaged concrete sidewalks, <br />curbs, gutters, wheelchair ramps, driveway approaches, and concrete pavement at high priority <br />locations (Exhibit 1). The locations were selected from a list of community requests that have <br />been field verified and ranked in terms of safety need. The project design is complete and bid <br />procedures have been followed as established by the City's Municipal Code and in accordance <br />with the Pubic Contracts Code. <br />The original project was advertised for bids on June 16 and 17, 2015. On July 8, 2015, the City <br />received and opened only one bid for this project. Staff speculates that only one bid was <br />received because "Non- Motorized Connectivity" was included as part of the job title. Staff <br />recommends rejecting that bid because it was nearly 50 percent higher than the engineer's <br />estimate. <br />23A -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.