My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - CONCRETE IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
09/01/2015
>
23A - PROJ - CONCRETE IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2015 5:55:09 PM
Creation date
8/27/2015 3:24:10 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
9/1/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Award for Citywide Concrete Improvements <br />September 1, 2015 <br />Page 2 <br />Staff re- advertised the project on July 17 and 18, 2015, and expanded the outreach to improve <br />bid advertisement and participation by contractors in the bid process. The re- advertised project <br />yielded seven bids which were opened on August 3, 2015. The following is a summary of the <br />results: <br />Contractor Participation Data <br />Santa Ana contractors receiving notices <br />1 <br />Contractors requesting bidding documents <br />7 <br />Bids received <br />7 <br />Bids received from Santa Ana contractors <br />1 <br />Bid Results Summary <br />RANK <br />BIDDER'S NAME <br />LOCATION <br />BID <br />1 <br />Ruiz Concrete & Paving, Inc. <br />Long Beach <br />$607,094.33 <br />2 <br />All American Asphalt <br />Corona <br />$691,276.00 <br />3 <br />Elite Bobcat Service <br />Corona <br />$708,235.00 <br />4 <br />Hardy & Harper, Inc. <br />Santa Ana <br />$733,000.00 <br />5 <br />Excel Paving Company <br />Long Beach <br />$794,868.00 <br />6 <br />Vido Samarzich, Inc. <br />Alta Loma <br />$861,834.00 <br />7 <br />Nobest, Inc. <br />Westminster <br />$908,662.00 <br />All seven bids were deemed responsive. Ruiz Concrete & Paving, Inc. submitted the lowest <br />responsive bid in the amount of $607,095, which compares favorably with the engineer's estimate <br />of $630,000. Therefore, staff recommends award of this contract to Ruiz Concrete & Paving, Inc. <br />Not all sidewalk repairs Citywide will be completed under this contract. Staff has started a study <br />to evaluate all of the sidewalks and pedestrian pathways in the City. That study will result in a <br />comprehensive priority list based on many more factors. Staff will follow up with another <br />construction project to repair concrete sidewalks based on the updated list. The study and its <br />corresponding priority list will be available for review at the end of 2015. <br />STRATEGIC PLAN ALIGNMENT <br />Approval of this item supports the City's efforts to meet Goal #6 Community Facilities & <br />Infrastructure, Objective #1 (establish and maintain a Community Investment Plan for all City <br />assets), Strategy B (equitably maintain existing streets and associated assets in a state of good <br />repair so they are clean, safe, and aesthetically pleasing for all users), Strategy C (invest <br />23A -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.