My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10A - MINUTES - 08-04-15 AND 08-18-15
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
09/01/2015
>
10A - MINUTES - 08-04-15 AND 08-18-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2015 5:52:33 PM
Creation date
8/27/2015 4:33:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
10A
Date
9/1/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FY 15 -16 DEFERRED MAINTENANCE PRIORITIES <br />Priority 1-Safety/ Liability/ Function <br />e) Police Department Jail: Domestic Water <br />Line -Phase I $150K <br />f) Ross Annex Carpet Replacement — <br />Phase l$75K <br />g) City Hall: Elevator Smoke Screen - <br />DIN— 1 tANI <br />FY 15 -16 DEFERRED MAINTENANCE PRIORITIES <br />Priority 1 — Continued Various City Facilities <br />Other Prcjectsl f. Maintenance: f410k <br />City Hall - Rebuild Air Handler 3 of 9 <br />Newhope Libraryderome Center G lSouthwest Senior Canter/Corbin Center - Address defened <br />maintenance to extentl useful life of fyacilities- <br />Santa Ana Senior Center V St. - Replace HVAC Control System; Automate Interior lighting; <br />ReplaceMpgrade Electric Panel- <br />Main Library - Install HVAC in Computer Lab; Rebuild 1 of 2Air Handler - <br />Ross Annex Parking - Improve illumination to increase visabilry <br />El Salvador Center- Upgrade Extenor HVAC Searily Enclosures (Liability) <br />$2,225,000 in total for Phonily 1 Projects <br />sl <br />i <br />FY 15 -16 DEFERRED MAINTENANCE PRIORITIES <br />Priority i - Safety / Liability / Function <br />a) SARTC- $480k: <br />Asphalt Replacement <br />• HVAC Repairs-Phase 2 <br />b) SAPID Administration <br />General Repairs- $335k: <br />• Fuel Tank Management System <br />upgrade <br />• Rebuild Air Handlers <br />• Replace Central Pant Circulation <br />Pumps <br />Rebuild Compound Gate Operator <br />• Replace Hot Water Heater <br />• Replace Roll Up Dow <br />52 <br />CITY COUNCIL MINUTES 1 ok3 67 AUGUST 18, 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.