My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25L - AGMT - DESIGN PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
09/01/2015
>
25L - AGMT - DESIGN PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2015 6:01:45 PM
Creation date
8/27/2015 5:13:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25L
Date
9/1/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID ADVERTISEMENT, CONSTRUCTION ADMINISTRATION & RECORD DRAWINGS <br />Task 19 — Bid Advertisement <br />DEA will attend the pre -bid meeting and will provide responses to bid RFI's and assist with answering <br />questions, and providing clarification if conflicts arise. Each item will be reviewed by the City prior to <br />release of information. <br />Deliverables: Attendance at pre -bid meeting and bid assistance as noted above. <br />Task 20 — Construction Administration <br />DEA's construction management team will answer questions, review submittals, shop drawings and <br />schedules required 'to be submitted by the contractor for conformance with the design plans and <br />specifications'. The DEA team will review and respond to RFI's and clarifications during construction <br />within five calendar days of receipt. We understand that the City will handle the day to day construction <br />management process; therefore (at this time) construction site visits are not included in our scope as <br />directed by the City through the Q &A RFP process. <br />DEA has anticipated the hours denoted in the fee schedule for each of the respective disciplines. Please <br />note that this task shall require compensation on a time and materials basis in accordance with the level <br />of effort required / desired. The fees for this task are shown for budgetary purposes only and shall be <br />determined prior to the start of construction to allow the City to decide how best to utilize the DEA team <br />resources along with their own staffing. At this time, it is difficult to determine the level of effort for the <br />tasks listed and therefore we recommend negotiating this task once the contractor has been selected <br />and prior to construction. <br />Task 21 — Record Drawings I As Built Plans 12 <br />Utilizing General Contractor provided red lines, DEA will incorporate As Built information into the drawing <br />files such that we can provide the City with 'Record Drawings'. <br />Deliverables: One set of As Built plans based on contractor provided red lines. <br />RELEVANT PROJECT EXPERIENCE <br />Over the course of nearly 40 years of landscape architectural design, DEA has endeavored to find the <br />best solutions for our clients, bringing forward innovation and creativity that not only meet our clients' <br />schedules and budgets, but gives back to the greater community in which our clients operate. Aside <br />from creative, leading -edge work, DEA maintains a strong resume for day -to -day municipal projects. In <br />all of our work, we are guided by our core purpose; as a company, we strive to improve the quality of life <br />while demonstrating stewardship of the built and natural environments. The following is a sample of our <br />work and demonstration of our recent success. This experience was chosen to represent our diversity in <br />problem solving skills as well as our ability to efficiently bring the best expertise to bear on a given project <br />regardless of the location or the nature of the challenge. By having offices in the Southern California <br />region since 1986, we have worked with over 60 cities throughout Los Angeles, Orange, Riverside, San <br />Bernardino. and Riverside counties. <br />Tracks at Brea - Segment 3, Brea, California <br />DEA landscape architects and civil engineers prepared conceptual <br />and final construction documents for a one mile segment of Class I <br />meandering trail through an abandoned rail corridor in Brea. Segment <br />3 included work between Brea Boulevard and State College Boulevard <br />and incorporates both hard and soft surface trail, native plantings, site <br />furnishings, and a lighted parking area. Future uses include a restroom <br />building, splashpad, plaza space, community gardens, bioswale, fitness <br />area and interpretive signage. <br />25L -26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.