My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - RESO FOR EIR WARNER AVE WIDEN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
09/01/2015
>
75B - PH - RESO FOR EIR WARNER AVE WIDEN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2015 6:04:50 PM
Creation date
8/27/2015 5:32:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75B
Date
9/1/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
acquisitions, and an increase of 4 partial acquisitions, compared to the proposed project. <br />Facts in Support of Finding: <br />• This alternative would achieve all project objectives. <br />• This alternative would reduce the number of residential parcels that would be affected by <br />construction noise; however, this impact would remain significant and unavoidable in this <br />alternative, as it would for the proposed project. <br />• The 110 South Alternative would reduce environmental impacts to population and <br />housing; all other environmental topics would be similar to the proposed project. <br />• This alternative would result in the loss of a strip of property along the north side of <br />James Monroe Elementary School, National Guard Armory, and Delhi Park and the <br />demolition of Cherry Aerospace, a large industrial parcel that provides the community <br />with income and employment opportunities. While fewer homes would be demolished <br />under this alternative, the demolition of Cherry Aerospace would not be an economically <br />feasible substitute. Additionally, the impact to public facilities would have greater effects <br />to the community compared to the proposed project. <br />• Land use and planning impacts would be greater than the proposed project. <br />Finding: The City of Santa Ana finds, based on the Final FIR and the whole of the record, that <br />the 110 South Alternative is less desirable than the proposed project. Specific economic, legal, <br />social, technological, or other considerations, including considerations for the provision of <br />employment opportunities for highly trained workers, make this alternative less than desirable <br />than the proposed project. Public Resources Code § 21081 [a] [3], Guidelines § 15091 [a] [3]). <br />C. 120 South Alternative <br />This alternative would use a 120 -foot total ROW width, the City of Santa Ana standard Major <br />Arterial ROW, and would align most of the road widening to the south of the existing centerline. <br />The ROW includes six 12 -foot lanes, a 14- foot -wide raised landscaped median, 7 -foot <br />shoulder/bike lanes, and 10 -foot parkway and sidewalk. This alternative would require 31 full and <br />25 partial parcel acquisitions. <br />Compared to the proposed project, the major differences with this alignment are the acquisition <br />and building removal of three additional commercial parcels (at the strip commercial center), the <br />fire station, and two industrial parcels (Cherry Aerospace and H &H asphalt). The majority of <br />impacts to full residential parcels would be shifted from the north to the south side of Warner <br />Avenue and result in the reduction of 4 full acquisitions. <br />Facts in Support of Finding: <br />• This alternative would result in the loss of a significant strip of property along Warner <br />Avenue at the Monroe Elementary School, National Guard Armory, and Delhi Park. <br />• This alternative would not reduce either of the significant and unavoidable impacts of the <br />proposed project, and would increase environmental impacts to air quality, greenhouse <br />gas emissions, and hazards and hazardous materials. Long term traffic noise impacts <br />may be reduced. All other environmental topics would be similar to the proposed project. <br />CEQA Findings of Fact - 15 - <br />Warner Avenue Improvements & Widening from Main Street to Grand Avenue Aug 2015 <br />75B -27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.