My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19E - RFP - GRAFFITI
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
09/01/2015
>
19E - RFP - GRAFFITI
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2015 1:20:35 PM
Creation date
8/31/2015 12:22:32 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19E
Date
9/1/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Work orders shall include: <br />i. Location or address, <br />ii. Before and after photos; <br />iii. Date and time of work order creation; <br />V. Date and time of removal performed, <br />V. Response time in hours, <br />vi. City department, <br />vii. City contact name, <br />viii. Date and time of request, <br />X. Date and time of work performed, <br />X. Square footage, <br />xi. Surface type, <br />xii. Public or private property, <br />xiii. Brief description of graffiti, <br />xiv. Description of remedy, and <br />xv. Gang tag ID <br />c. Work order system shall include personalized and secure client logins, and City personnel may <br />monitor City work orders and projects. <br />d. Location shall include a Global Positioning System (GPS) link attached to Google or other <br />commonly used online mapping application. <br />e. Web based system must be able to show: <br />i. All work order status, <br />ii. Maps of zones as provided by City, <br />iii. Response time to work orders, <br />V. Costs by zones, <br />V. Square footage cleaned by zones, <br />vi. Custom graphs and reports to include but not limited to, <br />vii. Total Locations received from Graffiti Hotline, <br />viii. Total Location received from App <br />X. Total Square Footage Removed <br />X. Average response time for service calls through Graffiti Hotline /App <br />1. Same Day Response <br />2. Within 24 Hours <br />3. Within 48 Hours <br />4. Over 48 Hours and /or referred to other Agencies <br />xi. Maps in Google Earth, <br />f. The City shall have access to this data following completion of the work order for a period of three <br />years. <br />g. All data collected in the database for this project is the property of the City of Santa Ana. <br />III. MOBILE APPLICATION TOOL <br />a. Contractor shall provide a mobile application free for City personnel and the general public. <br />b. This application shall allow for the submission of photos of graffiti electronically into Contractor's <br />Work Order System. <br />c. Reporting party shall automatically receive an electronic response with all before and after photos <br />once the work has been completed. <br />City of Santa Ana GRSC Services RFP Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.