My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-18 Regular
Clerk
>
Minutes
>
CITY COUNCIL
>
2010-2019
>
2015
>
2015-08-18 Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2019 1:51:53 PM
Creation date
9/9/2015 1:45:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Minutes
Agency
Clerk of the Council
Date
8/18/2015
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FY 15-16 DEFERRED MAINTENANCE PRIORITIES <br />Priority 2 -Safety / Liability / Function <br />C) SAPID Jail: General Repairs-$140K: <br />• Jail Kitchen -Replace compressor <br />system for walk-in freezers & <br />refrigerators <br />• Jail- Install Germicide in B Air <br />Handling Units <br />d) City Hall: Carpet Replacement- $110K <br />e)Ross Annex: Carpet Replacement — <br />Phase 2 $75K <br />0 City Hall: Elevator Smoke Screen — Phase <br />2 $45K <br />v <br />FY 15.16 DEFERRED MAINTENANCE PRIORITIES <br />j) Various Facilities/General Repairs-$345k: <br />Main Library - Rebuild 2 of 2 Air Handler <br />Main Library - Wet Seal North Facing Windows <br />Jerome Center- Replace Automated Lighting Control System <br />City Hall- Paint I It Floor Interior <br />Newhope Library - Paint Interior <br />McFadden Learning Center- Rebuild Air Handler <br />El Salvador Center- Paint Interior <br />Santa Ana Senior Center- Paint Interior <br />Southwest Senior Center Public Restrooms -Upgrade Restroom Fixtures <br />Annex- Replace Variable Speed Drives <br />Annex- Paint Interior <br />Santa Anita Center- Paint Interior <br />Corbin Center- Upgrade Kitchen Fixtures <br />$1,530,000 In Total for Priority 2 Prolects <br />FY 15-16 DEFERRED MAINTENANCE PRIORITIES <br />Priority 3 - safety / Liability / Function <br />a) Train Station: General Repairs <br />b) SAPD: General Repairs <br />c) Corp Yard - Fleet: Roof Restoration <br />d) Santa Ana Senior Center: Roof Restoration <br />e) Ross Annex: Replace 1 of 3 HVAC <br />f) City Hall: Paint and Carpet Phase 2 <br />g) City Hall: Elevator Smoke Screen - Phase 3 <br />h) City Hall: Rebuild Air Handler- Phase 3 <br />i) Various Facilities: General Repairs <br />Approximately S3.2M Total <br />54 <br />r <br />CITY COUNCIL MINUTES 24 AUGUST 18, 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.