My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (28) - 2015
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (28) - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2015 10:35:47 AM
Creation date
9/29/2015 10:15:50 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
Contract #
A-2015-127
Agency
PUBLIC WORKS
Council Approval Date
7/7/2015
Expiration Date
6/30/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OCTA MEMORANDUM OF UNDERSTANDING NO. C -5 -3295 <br />SECTION 6 DESIGN & CONSTRUCTION <br />This Section is intended to provide general terms and conditions between the Parties for <br />the design and construction phase of the Project. A Design Agreement and Construction <br />Agreement shall in good faith be developed between the Parties to define in more detail <br />the roles, responsibilities, and expectations during the design and construction phase of <br />the Project. Topics to be addressed in detail in the Design Agreement and Construction <br />Agreement shall include, but not limited to, the following: <br />Project Management <br />• Project Administration <br />• Schedule <br />• Reporting <br />+ Public <br />Outreach /Relations <br />• Meetings <br />• Records <br />Management <br />• Procurements <br />« Project Closeout <br />Design <br />« <br />Design Criteria <br />• <br />Design Coordination <br />• <br />City Utilities <br />• <br />Non -City Utilities <br />• <br />Roadways <br />• <br />Stations /Stops <br />• <br />Landscape /Irrigation <br />• <br />Traffic Signals <br />• <br />Signage /Striping <br />• <br />Traction Power <br />+ <br />Track <br />• <br />Street Lighting <br />• <br />Design Reviews <br />6.1 Design <br />• Traffic Management: <br />• AIt in Transit <br />• Maintenance & <br />Storage Facility <br />Construction <br />• <br />Construction Phasing <br />• <br />Construction Access <br />• <br />Street Closures <br />• <br />Traffic Management <br />• <br />Construction <br />Coordination <br />• <br />Public Notification <br />• <br />City Construction <br />Inspection <br />• <br />OCTA Construction <br />Insp. <br />• <br />Construction <br />Acceptance <br />• <br />Permits <br />• <br />Safety <br />• <br />Quality <br />Real Estate <br />• Property Acquisitions <br />• Right of Way <br />Engineering <br />• Legal <br />Descriptions /Plats <br />• Property Surveys <br />• Utility Relocations <br />• Relocation <br />Assistance Program <br />• Property <br />Management <br />• Demolition <br />• Eminent Domain <br />Proceedings <br />Startup & Testing <br />Financial <br />• Funding <br />• Budget <br />• Cost Tracking <br />• Contingencies <br />• City Reimbursements <br />• Betterments <br />General Provisions <br />6.1.1 Project Configuration <br />The exhibits in the MOU showing the configuration of Project are based on the <br />approved environmental document and may not reflect the final configuration of <br />9 <br />L \Camm \CLERICAL \WORDPROC \AGREE \ag53295 SA OCTA MOUJinal 06.30.2015MOU.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.