My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20B - AA - OTS FUNDING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
10/20/2015
>
20B - AA - OTS FUNDING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2015 5:16:55 PM
Creation date
10/15/2015 4:53:18 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20B
Date
10/20/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE A <br />GRANT DESCRIPTION <br />GRANT No. PS1621 <br />PAGE 3 <br />changed, a draft press release shall be sent to the OTS PIO for approval. Optimum lead time <br />would be 10 -20 days prior to the release date to ensure adequate tum- around time, <br />b) Press releases reporting the results of grant activities such as enforcement operations are exempt <br />from the recommended advance approval process, but still should be copied to the OTS PIO and <br />Coordinator when the release is distributed to the press. <br />c) Activities such as warrant service operations and court stings that could be compromised by <br />advanced publicity are exempt from pre- publicity, but are encouraged to offer embargoed media <br />coverage and to report the results. <br />• Use the following standard language in all press, media, and printed materials: Funding for this <br />program was provided by a grant from the California Office of Traffic Safety, through the National <br />Highway Traffic Safety Administration. <br />• Email the OTS PIO at pio�dots.ca.aov and copy your OTS Coordinator at least 30 days in advance, a <br />short description of any significant grant - related traffic safety event or program so OTS has sufficient <br />notice to arrange for attendance and/or participation in the event. <br />• Submit a draft or rough -cut of all printed or recorded material (brochures, posters, scripts, artwork, <br />trailer graphics, etc.) to the OTS PIO at pioAots.ca.aov and copy your OTS Coordinator for approval <br />14 days prior to the production or duplication. <br />• Include the OTS logo, space permitting, on grant - funded print materials; consult your OTS <br />Coordinator for specifics. <br />C. Phase 3 — Data Collection & Renortina (Throughout Grant Year) <br />• Agencies are required to collect and report quarterly, appropriate data that supports the progress of <br />goals and objectives. <br />• Statistical data relating to the grant goals and objectives will be collected, analyzed, and incorporated <br />in Quarterly Performance Reports (QPRs). QPRs for the quarter ending September 30 will include <br />year -to -date comparisons of goals and objectives. If required, a separate quarterly data reporting <br />form will be completed each quarter and submitted as part of the QPR. <br />• Reports will compare actual grant accomplishments with the planned accomplishments. They will <br />include information concerning changes made by the Grant Director in planning and guiding the <br />grant efforts. <br />• Reports shall be completed and submitted in accordance with OTS requirements as specified in the <br />Grant Program Manual. <br />OTS -38b (Rev. 4/15) <br />rI- <br />
The URL can be used to link to this page
Your browser does not support the video tag.