My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VIDO ARTUKOVICH & SON, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
VIDO ARTUKOVICH & SON, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2016 3:55:31 PM
Creation date
10/19/2015 2:04:17 PM
Metadata
Fields
Template:
Contracts
Company Name
Vido Artukovich & Son, Inc.
Contract #
14-6439
Agency
Public Works
Council Approval Date
10/6/2015
Insurance Exp Date
1/1/1900
Document Relationships
23A - PROJ - BRISTOL WATER MAIN
(Amended By)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2016\11/15/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO. 14-6439 <br />BRISTOL STREET WATER MAIN REPLACEMENT <br />16 <br />Cut and Cap Existing Waterline <br />21 <br />EA <br />$ 6p0.`' <br />$ 00, <br />17 <br />Remove Existing Fire Hydrant <br />19 <br />EA <br />$ 700, ` <br />$ f'3� 30c,- <br />18 <br />Abandon Existing Valve <br />37 <br />EA <br />$ 6-66- <br />$ 00• r <br />19 <br />Remove and Dispose of Existing Valve <br />11 <br />EA <br />c <br />20 <br />Abandon Existing Main in Place <br />1 <br />LS <br />$ 74.e'r'Q <br />$ 25" PlyO, 9 <br />i <br />21 <br />2" Combination Air Vacuum Release <br />Assembly <br />5 <br />EA <br />,6-06. <br />$5 <br />- <br />$ <br />22 <br />4" Blow Off Assembly <br />8 <br />EA <br />$ ,ss <br />$ 3 Doo s <br />23 <br />Connect New Pipeline to Existing <br />18 <br />EA <br />$3, 00�',0•- <br />24 <br />Connect to Existing Concrete Cylinder Pipe <br />1 <br />EA <br />$ Z'00©•" <br />$ Z' 000. <br />25 <br />Replace Traffic Detector Loops <br />76 <br />EA <br />$heea, `= <br />$ 3g, Ocy@. <br />26 <br />Signing and Striping <br />1 <br />LS <br />$ls;aceh <br />$ ZS,00a <br />27 <br />As -Built Drawings <br />1 <br />LS <br />$30,000 <br />$30,000 <br />28 <br />OPTIONAL Vertical Offset <br />4 <br />EA� <br />$soc�� <br />r_ <br />$Z 0 0 <br />TOTAL BASE BID ITEMS 1-28 <br />$,Z/ 5v <br />The lowest responsible bidder shall be selected based on the BASE BID Amount. The City <br />reserves the right to award the Base Bid, and any, all or none of the alternate Bid Items. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete said work within one hundred (100) <br />working days after the commencement date stated in the Notice to Proceed. The bidder also <br />proposes to commence construction of the Work within thirty (30) calendar days after issuance <br />of a Notice To Proceed, and to continue in a diligent and workman -like manner without <br />interruption, and to complete the construction thereof within the time specified above. <br />The liquidated damages amount, in lieu of that specified in Subsection 6-9 of the Standard <br />Specifications, shall be $1000 per calendar day. <br />P -lc <br />Section 3-a P,,.,a 09222014do. <br />
The URL can be used to link to this page
Your browser does not support the video tag.