Laserfiche WebLink
Vida Artukovich & Son, Inc./Vidmar, Inc. A JV <br />Recent Completed Projects <br />City of Huntington Beach <br />2000 Main Street, Huntington Beach, CA 92648 <br />Andrew Ferrigno, P. E. 714 536-5291 AFerrigno surfcity-hb.org <br />Eric Honour, Dudek Construction Mgmt. 760 798-9095 Eric. honour(LDhotmail.com <br />Warner Avenue Gravity Sewer and Lift Station #C <br />Furnish and install 3,5001f 16" gravity C905, 5001f 12" ductile force main with all <br />appurtenances and lift station. <br />Original $9,846,863/Final $10,556,640 <br />Complete 5/7/15 306 work days <br />City of Pasadena Water & Power <br />150 Los Robles Avenue, Suite 200, Pasadena, CA 91101 <br />Natalie Ouwersloot, P.E. 626 744-7011 (nouwersloot@cityofpasadena.net) <br />Eastside Well Collector Pipeline <br />Furnish and install 22,000 If 16" and 24" DIP water main with all appurtenances <br />Original $4,764,721/Final $5,716,721 <br />Complete 5/23/14 Original 130 work days 236 actual <br />West Basin Municipal Water District <br />17140 S. Avalon Blvd., #210, Carson, CA 90746 <br />Veronica Govea 310 660-6269 (veronicag@westbasin.org) <br />NRG Recycled Water Conveyance Pipeline Project <br />Furnish and install 7,4241f 10" C905 PVC and connect to existing 12" PVC with <br />all appurtenance and flow control vault. <br />Original $2,279,038/Final $2,365,515 <br />Complete 2/23/13 — 300 calendar days <br />City of Santa Fe Springs <br />11710 Telegraph Rd., Santa Fe Springs, CA 90670 <br />Frank Beach 562 868-0511 (frankbeach@santafesprings.org) <br />1-5 Water Main Relocation for Carmenita Road Segment <br />Furnish and install 8,0271f 12" DIP, 4,0701f 16" DIP with all appurtenance <br />Original $4,114,930/Final $4,214,987 <br />Complete 1/30/13 — 84 work days <br />