My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
65A - SURPLUS ALLOCATION PLAN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
10/20/2015
>
65A - SURPLUS ALLOCATION PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2015 5:26:15 PM
Creation date
10/20/2015 3:58:51 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
65A
Date
10/20/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
after 2012. This allocation will provide funding to replace 42 vehicles that were <br />purchased 10+ years ago and have excessive mileage and repair costs, The older <br />vehicles are expensive to maintain and expose the City to potential liability hazards. <br />• CALLE CUATRO STREET SIGNS AND PLAZA CALLE CUATRO SIGNAGE ($25,000) <br />o Complete the design, fabrication, and installation of signage related to Calle Cuatro. <br />• SARTC Strategic Investment- Maintenance, Safety /Liability, Tenant space, signage <br />($3,800,000) <br />o Completion of essential deferred maintenance to attract and retain quality businesses <br />and transform SARTC into a destination location for travelers and the community. City <br />staff will begin to contract work for the critical areas as soon as funding is available. <br />Future projects will be coordinated by the on -site property management firm, once the <br />agreement is finalized. <br />• BIRCH PARK RESTROOM AND FENCING ($140,000) <br />o The only restroom available at Birch Park is in the Senior Center, Patrons of the park <br />only have access to the restroom when the center is open. Continual use of the <br />restroom also disrupts senior programs. A park restroom Is needed to service the public <br />and to minimize disruption in the senior center. A fence along the north and west side <br />of the park is proposed in order to close the park at night and be designed to enhance <br />the historical image of the park. Birch Park is the first and oldest park in the City of <br />Santa Ana. <br />• JOINT USE- GODINEZ FIELD AND TRACK ($500,000) <br />o Centennial /Godinez Fields are part of an existing Joint use agreement. The existing <br />sports field and track is of natural turf, decompose granite surface with sports lighting. <br />To improve programming and expand use of the Godinez football /soccer field and track, <br />both agencies are proposing to share the cost to install synthetic turf and rubberized <br />running track, Additional funding is needed to fund the city share of this project. <br />• SKATE PARK ($800,000) <br />o The community has been requesting a 2nd Skate Park in the City of Santa Ana. The first <br />skate park at Centennial Park is heavily used on a daily basis by skaters. The location of <br />the 2nd skate park should be placed at another section in the city, in a park that has the <br />space, and parking, and enough buffer to deal with the noise from the skaters. <br />• THORNTON PARKING LOT RENOVATION ($270,000) <br />o The asphalt on the existing parking lot is breaking down, turning to loose gravel and <br />parking stall lines are fading. Renovation is needed to preserve the parking lot. Work <br />will include removal, replacement, striping and ADA improvements. <br />• WALKWAY /SIDEWALK IMPROVEMENTS: CENTENNIAL, LILLIE KING & MEMORIAL ($590,000) <br />o The existing concrete walkway and asphalt walks are lifting and cracking due to tree <br />roots and soil condition, Sections of the walkway will be removed and replaced as part <br />of this project. <br />• CABRILLO TC CLAY COURT INSTALLATION ($400,000) <br />65A -11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.