My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
65A - SURPLUS ALLOCATION PLAN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
10/20/2015
>
65A - SURPLUS ALLOCATION PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2015 5:26:15 PM
Creation date
10/20/2015 3:58:51 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
65A
Date
10/20/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o The clay court installed on the southwest corner of Cabrillo Tennis Center is reserved on <br />a regular basis. Space is available to install 2 additional clay courts on the south portion <br />of Cabrillo Tennis Center. Project will include grading, clay courts, sports lighting, <br />fencing and nets. <br />• SECURITY LIGHTS: CENTENNIAL & KIWANIS BARRIER FREE PARK ($500,000) <br />• The existing security and parking lot lighting at Centennial Park was constructed with <br />wooden poles and high pressure sodium lighting. The poles are rotting at the base and <br />are a potential liability concern. The project will include replacing the wooden poles <br />with concrete poles and upgrading the lighting to energy efficient LED fixtures and <br />lamps. <br />• Kiwanis Barrier Free Park was constructed in Phases and the security lighting phase still <br />needs to be implemented. The park is heavily used during the day and early evening. <br />Security lighting is needed to provide safety to our park patrons during the evening and <br />to allow additional programming /use of the park by disadvantage children. <br />• SANTA ANA SENIOR CENTER 3RD ST- HVAC, LIGHTING, ELECTRICAL REPAIRS ($80,000) <br />o HVAC upgrade system; install Lighting controls to reduce kwh; upgrade obsolete electric <br />panel <br />• MAIN LIBRARY- HVAC REPLACEMENT ($55,000) <br />o Rebuild original (1958) air handlers that distribute air in library. <br />• GIS System Development (an additional $100k from Enterprise) <br />o Development of GIS System to increase functionality and software improvements. <br />65A -12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.