My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE-2015
Clerk
>
Contracts / Agreements
>
A
>
AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2018 4:48:59 PM
Creation date
10/21/2015 10:31:33 AM
Metadata
Fields
Template:
Contracts
Company Name
AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE
Contract #
A-2015-203
Agency
PUBLIC WORKS
Council Approval Date
9/1/2015
Expiration Date
8/31/2018
Insurance Exp Date
7/1/2018
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Technical and Regulatory Assistance <br />Amec Foster Wheeler has assisted several municipalities with technical and regulatory assistance. Our project team <br />has a thorough understanding of Orange County's MS4 permit, the County's DAMP, City's LIP, local water quality <br />ordinances, and other NPDES permit requirements. We regularly develop. comments on new regulations, permits, <br />and TMDLs on behalf of clients. Our project team has demonstrated our knowledge to the City during recent audits <br />by US EPA and RWQCB in which we successfully represented the City by providing reports, presentations, and <br />inspections to demonstrate our knowledge of the permits and the assistance we provide. <br />Development of BMPs and Translation of Materials <br />Amec Foster Wheeler has extensive experience providing guidance to industrial and commercial dischargers. Having <br />inspected and worked for thousands of industrial sites in Orange County, we understand the BMP implementation <br />requirements at industrial and commercial sites. We have used this experience in the past to develop BMP guidance <br />and training materials for many projects. We also have extensive experience in the design and installation of <br />numerous structural treatment control BMPs for industrial sites. For this project, we will maintain a library of BMP <br />resource materials to assist in the development of the program and we are always looking for additional resources and <br />guidance documents to provide to dischargers. As an example, Amec Foster Wheeler recently added guidance <br />documents for the no exposure certification (NEC) to our guidance document library and "tool boxes" so we can <br />hand these materials out when applicable. <br />Amec Foster Wheeler is a diversified consulting firm with employees fluent in various languages, including Spanish. <br />We have extensive experience translating environmental documents into other languages and we are prepared to assist <br />the City with any translation requirements necessary for this program. <br />Water Quality Complaints <br />We understand that this project may also involve responding to and investigating water quality complaints and reports <br />related to the City's ID/IC program. Our project team has performed neatly 2,000 water quality investigations for the <br />cities of Anaheim, Costa Mesa, and Santa Ana. We have worked closely with various city departments during many of <br />these investigations. We understand the importance of having personnel readily available to respond to water quality <br />complaints (within one hour or less) and have set up a redundant system with multiple authorized inspectors to <br />provide the City support when needed. Each of out inspection staff members is equipped with cell phones to allow <br />for prompt responses to emails and telephone calls from the City. We anticipate that our authorized inspectors will <br />have open lines of communication with the City during the investigations similar to the communication we have had <br />under the existing inspection contract. Following each ID/IC investigation, we will provide a detailed email sununary <br />with photographs and recommendations to the City within one business day of the incident. <br />Schedule <br />Inventory update <br />Kick-off Meeting/Annual <br />training specific to the City <br />inspection program <br />Update announcement letters <br />Send announcement letters in <br />batches <br />Inspections/re-inspections are <br />performed (assumes 910 <br />inspections per year) <br />Enforcement <br />discussions/phone calls <br />Senior review of forms <br />City representatives & Amec <br />Complete by October each year <br />Foster Wheeler team <br />October each year <br />Typically, sent out monthly <br />October to June each year <br />October to June each year <br />October to June each year <br />Mike Lowther <br />Amec Foster Wheeler <br />administrative staff, Mike <br />Lowther <br />NPDES inspectors <br />NPDES inspector involved, Mike <br />Lowther and/or Brent Smith <br />Brent Smith & Mike Lowther <br />Commercial/Industrial Inspection and Database Management Consultant services amecfw.com Page 12 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.