Laserfiche WebLink
JAN -25 -2001 10:20 CIT" OF TUSTIN 714 838 1602 P.04i13 <br />The intersection of Grand /Edinger is designated as an enhanced intersection per the <br />City's Circulation Element. Three of the intersection legs will be widen in the short <br />range. Santa Ana/Tustin TSIA fee would fund the north and west legs while the project <br />(MCAS Tustin) is responsible for funding 100% of the south in the short range. The <br />City of Santa Ana requests Tustin to widen the east leg in the short range to coordinate <br />and provide the proper lane alignment with the west leg. In summary If three <br />intersection legs are widened, the fourth leg must also be widen concurrently. <br />In exchange for the full improvements at Grand /Dyer and Grand /Edinger the City of <br />Santa Ana will forgo mitigation of the other intersections. A detailed cost estimate and <br />preliminary plan is attached for your review. If you or your staff have any questions <br />regarding the cost estimates or scope of work please call me at your convenience. <br />Sincerely, <br />George A� ez��� <br />City Engineer <br />cc: Cindy Nelson <br />Jim Ross <br />Ben Kaufman <br />Enclosures <br />KASr. Managemen9Lede SkChrstine Shingletan 6AUflD.0ee <br />