My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT - PD SOFTWARE SYS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
11/17/2015
>
25B - AGMT - PD SOFTWARE SYS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 2:33:31 PM
Creation date
11/12/2015 1:58:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
25B
Date
11/17/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional Code Files (as specified in Appendix A - Required Inform CAD DOLF Code File build) will be <br />configured during the DOLF. <br />Following the DOLF process, ownership of Code Files transfers to the Client. Post DOLF, the Client will <br />enter the balance of the Code Files (not built by TriTech). These arc typically goo- centric items that require <br />local knowledge of the community. The Client also becomes responsible for maintaining Code Files <br />(personnel, unit, and the like) that must be continuously updated to keep the Code Files in GO -Live ready <br />status. During this phase, the assigned TriTech Business Analyst will provide consultation services. <br />Note: Inform CAD DOLF is an event applicable to Inform CAD only. No other Systems or <br />Subsystems will be demonstrated during this session. „ <br />73.5.1 TriTech Responsibilities <br />a) Schedule the onsite DOLF meeting in accordance with the Client's availability and the Project Schedule. <br />b) Prepare and distribute the meeting agendas to all required attendees a week prior to each meeting. <br />c) Conduct the meetings based on the distributed agenda. <br />d) Provide initial hands on training on the applicable system and introduction to different modules and their <br />configurations. <br />Note: This training is not meant to be comprehensive for end user understanding of the Subsystem. <br />The purpose is to give the participant an understanding of basic features, call flow and how the <br />configuration files influence them. <br />e) Review the maps for Inform CAD. <br />f) Introduce the Client to and begin documentation within the Inform CAD Subsystem Journal. <br />g) Document and assign owners and due dates for any action items and track all action items to closure in <br />the Inform CAD Subsystem Journal. <br />h) Develop and deliver the "DOLF Report" which serves as an "as built" document describing the build of <br />the system following the DOLE <br />i) Handoff the management the Code Files to the Client. <br />j) Provide the Client team with a copy of the Inform CAD User and Application Administration Guides. <br />k) Prepare and submit a TCR. <br />7.342 Client Responsibilities <br />a) Provide adequate facilities to hold the DOGE to include an overhead projector. Two projectors are <br />preferred. DOLF also requires workstations for each participant. <br />b) Provide subject matter experts that can examine the hierarchy build as articulated to the Business <br />Analyst in terms of the agency structure. <br />c) Provide subject matter experts that can examine the proposed call flow. These persons should have the <br />ability to make decisions regarding any changes in call flow that may arise through the use of the new <br />Subsystem. <br />d) Provide participants that are versed with the ability to continue the configurations, or Code File build <br />once ownership transfers. <br />e) Provide participants that will be able to verify the agency's geopolitical /operational boundaries. <br />f) Provide participants that were responsible. for translating the geopolitical /operational boundaries into <br />data (BSRI shape Files) suitable for use within the Subsystem, and are able to validate those boundaries. <br />30 <br />25B -76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.