My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT - PD SOFTWARE SYS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
11/17/2015
>
25B - AGMT - PD SOFTWARE SYS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 2:33:31 PM
Creation date
11/12/2015 1:58:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
25B
Date
11/17/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Execution <br />Attendance of the Client- designated individuals should be coordinates[ and scheduled through TrUech's <br />Project Manager and should be coordinated in such a way that does not interfere with progress of the Project. <br />System Administration classes are held regularly in TriTech's training facility in San Diego and may have <br />attendees registered from agencies other than the Client. <br />Training classes start on a Monday and end on Friday. The number of attendees will be based ou the number <br />of seats that have been purchased by the Client. If more than one seat is purchased by the Client, the Client <br />has the option to send their attendees to one class or different classes. <br />Prerequisites; Basic Windows and SQL Server knowledge <br />No other deliverables or follow up activities, including creating special material or applications for the <br />Client, are included within the scope of this class. <br />7A.1 Inform Mobile System Orientation <br />The Inform Mobile Inform Mobile System Orientation is conducted by a TriTech Inform Mobile Business <br />Analyst. Inform Mobile is an Inform CAD - Integrated System, meaning that a significant amount of mobile <br />functionality is dependent upon CAD functions as well as the configuration of the Client's Inform CAD <br />system. Given this interdependency, the Inform Mobile Inform Mobile System Orientation generally will <br />follow Inform CAD Inform Mobile System Orientation. <br />During the Inform Mobile Inform Mobile System Orientation, the Business Analyst will give a <br />demonstration of the Mobile product. It is suggested that Client personnel who will be responsible for <br />facilitating Mobile end user training should also take part in the configuration of Mobile. <br />The TriTech Business Analyst will document the Client's configuration options in a Configuration <br />worksheet which will be presented to the Client team for review and approval prior at least two weeks prior <br />to configuring the application. <br />7.4.1,1 TriTech Responsibilities <br />a) Schedule the Inform Mobile Inform Mobile System Orientation meeting in accordance with the Client's <br />availability and the Project Schedule, <br />b) Prepare and distribute the meeting agendas and documents for Client review or completion to all <br />required attendees two weeks prior to each meeting, <br />c) Conduct the meetings based on the distributed agenda. <br />d) Document the Client's requirements and configuration speoificatiors resulting from the Inforni Mobile <br />System Orientation within the configuration document. <br />e) Document and assign owners and due dates to any action items and track all action items to closure. <br />f) Complete the configuration worksheets and deliver to the Client for review and approval. <br />g) Produce an Inform Mobile System Orientation Report with the key decisions and configuration points as <br />a result of the System Orientation. Review the draft report with the Client and incorporate modifications. <br />7.4,1.2 Client Responsibilities <br />a) Provide adequate facilities to comfortably hold the Inform Mobile System Orientation to include a <br />computer projector, whiteboards, and adequate seating. Two projectors are preferred. <br />b) Provide communications center and field representatives authorized to make decisions with regard to the <br />interrelationship between Mobile use and dispatcher control functions such as status updates; traffic <br />stops and the like, <br />37 <br />25B -83 <br />
The URL can be used to link to this page
Your browser does not support the video tag.