Laserfiche WebLink
4. Consultant Responsibilities <br />a. Setup Production Lawson 10.x Environment <br />This set of tasks involves setting up and configuring a new Lawson 10.x Production environment. After <br />its initial build, it will be used as a Test environment, refreshed as needed, and ultimately become the <br />new Lawson I O.x Production environment after the final upgrade cutover. <br />1. Download the Infor Lawson 10.x, required component software from the Infer and 3rd party <br />websites. <br />2. Install and configure Infor Lawson 10.x Application Server. <br />3. Install and configure Infor Landmark Server. <br />4. Install and configure Microsoft SharePoint Server and Infer Ming.le Foundation for Infer <br />Lawson 10.x. <br />5. Configure Lawson Security as Secure Token Server (LS as STS) <br />6. Upgrade Lawson System and Applications to the latest available ESP and MSP service packs for <br />Infor Lawson 10.x. <br />7. Migrate restored existing Production databases to SQL Server 2012 initially, as needed for test <br />refreshes, and during the final Lawson I O.x upgrade cutover. <br />8. Migrate existing Lawson 9.0.1 Process Flows to the latest version of Infor Process Automation <br />(IPA) for Infor Lawson 10.x, <br />9, Migrate Lawson Security and perform LDAP bind in Lawson 10.x environment, <br />10. Provide Infor Lawson I O.x and Landmark training and knowledge transfer to City technical staff. <br />11. Provide fundamental basic testing of Lawson I O.x environment after build and refreshes. <br />12. Confirm LBI connectivity using current LBI TEST system (this will change to PROD LBI as one <br />of go live cutover tasks). <br />13, Create and test backup and log archiving scripts. <br />14. Perform final go -live production cutover migration and configuration. <br />b. Setup Test Lawson I O.x Environment <br />This set of tasks involves setting up and configuring a new Lawson 10.x Test environment from a copy of <br />the newly created Lawson 10.x Production environment (cleric the Production environment to Test) after <br />the Production environment is tested. <br />1. Database migration. <br />2, Product Line copy from Production 10.x Instance to Test instance. <br />3. Configure the environment with different naming that identifies it as a Test environment. <br />4. Process Flow to IPA migration. <br />5. Lawson Security Migration <br />6. Confirm LBI connectivity using current LBI TEST system. <br />C. Provide detailed weekly status reports. <br />d. Provide Post -Live Support. <br />Consultant will provide post -live support for system issues encountered after the upgrade through the <br />term of this agreement. <br />Page 8 of 9 <br />