My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MICHAEL BAKER INTERNATIONAL, INC. (f/n/a RBF) 5 - 2015
Clerk
>
Contracts / Agreements
>
M
>
MICHAEL BAKER INTERNATIONAL, INC. (f/n/a RBF) 5 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 11:54:10 AM
Creation date
12/7/2015 4:07:03 PM
Metadata
Fields
Template:
Contracts
Company Name
MICHAEL BAKER INTERNATIONAL, INC. (f/n/a RBF)
Contract #
A-2015-170
Agency
PUBLIC WORKS
Council Approval Date
8/4/2015
Expiration Date
8/4/2019
Insurance Exp Date
8/30/2017
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Assistance Procedures Manual <br />EXHIBIT 10-H COST PROPOSAL Page 1 of <br />SPECIFIC RATE OF COMPENSATION (USE FOR ALL ON -CALL OR AS -NEEDED CONTRACTS) <br />(CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS) <br />RBF Consulting, a Company of Michael <br />Consultant or Subconsultant Baker Corporation Contract RFP No. 14-037 <br />Fringe Benefit% Overhead% <br />46.1% + 65.2% <br />BILLING INFORMATION <br />EXHIBIT 10-H <br />Cost Proposal <br />Date January 30, 2015 <br />G&A % Combined % <br />+ 45.7% = 156.95% <br />FEE % = 10.0% <br />CALCULATION INFORMATION <br />Name/Classification <br />Hourly Billing Rate <br />Effective date of <br />hourly rate <br />Actual/ <br />average hourly <br />rate <br />% or $ <br />Increase <br />Hourly Range for <br />Class <br />Normal <br />(1O X) <br />OT <br />(2 0 X) <br />From <br />To <br />Mike Chesney <br />2 9.96 <br />N/C <br />N/C <br />1/30/2015 <br />6/30/20 <br />99.05 <br />% <br />N/A <br />Project Ma <br />Exempt <br />93 <br />N/C <br />N/ <br />1/2015 <br />6/30 16 <br />1 .00 <br />5.00% <br />8.65 <br />N/ <br />/C <br />7/1/ 6 <br />012 <br />109.20 <br />5.00% <br />N/A <br />32"6 <br />N/C <br />NL <br />1/2017 <br />6/ 2018 <br />114.66 <br />5.00 ° <br />N <br />Josue Vaglienty <br />158.65 <br />N/C <br />N/C <br />1/30/2015 <br />6/30/2015 <br />56.13 <br />0% <br />N/A <br />Task Manager <br />Civil Engineering <br />Exempt <br />166.59 <br />N/C <br />N/C <br />7/1/2015 <br />6/30/2016 <br />58.94 <br />5.00% <br />N/A <br />174.93 <br />N/C <br />N/C <br />7/1/2016 <br />6/30/2017 <br />61.89 <br />5.00% <br />N/A <br />183.66 <br />N/C <br />N/C <br />7/1/2017 1 <br />6/30/2018 <br />64.98 <br />5.00% <br />N/A <br />Michael Bruz <br />271.79 <br />N/C <br />N/C <br />1/30/2015 <br />6/30/2015 <br />96.16 <br />0% <br />N/A <br />Task Manager <br />Civil Engineering <br />Exempt <br />285.39 <br />N/C <br />N/C <br />7/1/2015 <br />6/30/2016 <br />100.97 <br />5.00% <br />N/A <br />299.66 <br />N/C <br />N/C <br />7/1/2016 <br />6/30/2017 <br />106.02 <br />5.00% <br />N/A <br />314.64 <br />N/C <br />N/C <br />7/1/2017 <br />6/30/2018 <br />111.32 <br />5.00% <br />N/A <br />�lerQrdz <br />255.48 <br />N/C <br />N/C <br />1/30/2015 <br />6/30/2015 <br />90.39 <br />0% <br />N/A <br />Task Mana <br />Traffic Planning and ' eering <br />Exempt <br />6 <br />N/C <br />N/C <br />11/2015 <br />6/3012 <br />94.9 <br />% <br />N/A <br />281.68 <br />N/C <br />N/C <br />7/1/2 <br />6/3 017 <br />.66 <br />5.00% <br />N <br />295 <br />2017 <br />- /30/2018 <br />104.64 <br />5.00% <br />N/A <br />Page 1 of 11 <br />LPP 15-01 January 14, 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.