My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MICHAEL BAKER INTERNATIONAL, INC. (f/n/a RBF) 5 - 2015
Clerk
>
Contracts / Agreements
>
M
>
MICHAEL BAKER INTERNATIONAL, INC. (f/n/a RBF) 5 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 11:54:10 AM
Creation date
12/7/2015 4:07:03 PM
Metadata
Fields
Template:
Contracts
Company Name
MICHAEL BAKER INTERNATIONAL, INC. (f/n/a RBF)
Contract #
A-2015-170
Agency
PUBLIC WORKS
Council Approval Date
8/4/2015
Expiration Date
8/4/2019
Insurance Exp Date
8/30/2017
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Assistance Procedures Manual <br />EXHIBIT 10-H COST PROPOSAL Page 1 of <br />SPECIFIC RATE OF COMPENSATION (USE FOR ALL ON -CALL OR AS -NEEDED CONTRACTS) <br />(CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS) <br />RBF Consulting, a Company of Michael <br />Consultant or Subconsultant Baker Corporation <br />Fringe Benefit% Overhead% <br />46.1% + 65.2% <br />BILLING INFORMATION <br />EXHIBIT 10-H <br />Cost Proposal <br />Contract RFP No. 14-037 Date January 30, 2015 <br />G&A % Combined % <br />+ 45.7% = 156.95% <br />FEE % = 10.0% <br />CALCULATION INFORMATION <br />Name/Classification <br />Hourly Billing Rate <br />Effective date of <br />hourly rate <br />Actual/ <br />average hourly <br />rate <br />% or $ <br />Increase <br />Hourly Range for <br />Class <br />Normal <br />(1O X) <br />(2.0 X) <br />From <br />To <br />John Andrew <br />203.96 <br />N/C <br />N/C <br />1/30/2015 <br />6/30/2015 <br />72.16 <br />0% <br />N/A <br />Task Manager <br />Landscape Architecture <br />Exempt <br />214.16 <br />N/C <br />N/C <br />7/1/2015 <br />6/30/2016 <br />75.77 <br />5.00% <br />N/A <br />224.87 <br />N/C <br />N/C <br />7/1/2016 <br />6/30/2017 <br />79.56 <br />5.00% <br />N/A <br />236.12 <br />N/C <br />N/C <br />7/1/2017 <br />6/30/2018 <br />83.54 <br />5.00% <br />1 N/A <br />Brian Anderson <br />168.00 <br />N/C <br />N/C <br />1/30/2015 <br />6/30/2015 <br />59.44 <br />0% <br />N/A <br />Project Engineer <br />Roadway/Civil <br />Exempt <br />176.40 <br />N/C <br />N/C <br />7/1/2015 <br />1 6/30/2016 <br />62.41 <br />5.00% <br />N/A <br />185.22 <br />N/C <br />N/C <br />7/1/2016 <br />6/30/2017 <br />65.53 <br />5.00% <br />N/A <br />194.49 <br />N/C <br />N/C <br />7/1/2017 <br />6/30/2018 <br />68.81 <br />5.00% <br />N/A <br />Alan Su <br />152.63 <br />N/C <br />N/C <br />1/30/2015 <br />6/30/2015 <br />54.00 <br />0% <br />N/A <br />Project Engineer <br />Roadway/Civil <br />Exempt <br />160.26 <br />N/C <br />N/C <br />7/1/2015 <br />6/30/2016 <br />56.70 <br />5.00% <br />N/A <br />168.29 <br />N/C <br />N/C <br />7/1/2016 <br />6/30/2017 <br />59.54 <br />5.00% <br />N/A <br />176.71 <br />N/C <br />N/C <br />7/1/2017 <br />6/30/2018 <br />62.52 <br />5.00% <br />N/A <br />Brendan Dugan <br />114.84 <br />N/C <br />N/C <br />1/30/2015 <br />6/30/2015 <br />40.63 <br />0% <br />N/A <br />Project Engineer <br />Roadway/Civil <br />Exempt <br />120.58 <br />N/C <br />N/C <br />7/1/2015 <br />6/30/2016 <br />42.66 <br />5.00% <br />N/A <br />126.60 <br />N/C <br />N/C <br />7/1/2016 <br />6/30/2017 <br />44.79 <br />5.00% <br />N/A <br />132.93 <br />N/C <br />N/C <br />1 7/1/2017 1 <br />6/30/2018 <br />47.03 <br />5.00% <br />N/A <br />Page 2 of 11 <br />LPP 15-01 January 14, 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.