Laserfiche WebLink
Local Assistance Procedures Manual <br />EXHIBIT 10-H COST PROPOSAL Page of <br />SPECIFIC RATE OF COMPENSATION (USE FOR ALL ON -CALL OR AS -NEEDED CONTRACTS) <br />(CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS) <br />RBF Consulting, a Company of Michael <br />Consultant or Subconsultant Baker Corporation <br />Fringe Benefit% Overhead% <br />46.1% + 65.2% <br />BILLING INFORMATION <br />EXHIBIT 10-H <br />Cost Proposal <br />Contract RFP No. 14-037 Date January 30, 2015 <br />G&A % Combined % <br />+ 45.7% = 156.95% <br />FEE % = 10.0% <br />CALCULATION INFORMATION <br />Name/Classification <br />Hourly Billing Rate <br />Effective date of <br />hourly rate <br />Actual/ <br />average hourly <br />rate <br />%or $ <br />Increase <br />Hourly Range for <br />Class <br />Normal <br />(1O X) <br />(2O X) <br />From <br />To <br />Juan Zavala <br />79.28 <br />93.31 <br />107.33 <br />1/30/2015 <br />6/30/2015 <br />28.05 <br />0% <br />N/A <br />Design Technician <br />Non-exempt <br />83.24 <br />97.96 <br />112.69 <br />7/1/2015 <br />6/30/2016 <br />29.45 <br />5.00% <br />N/A <br />87.39 <br />102.85 <br />118.31 <br />7/1/2016 <br />6/30/2017 <br />30.92 <br />5.00% <br />N/A <br />91.77 <br />108.01 <br />124.24 <br />7/1/2017 <br />6/30/2018 <br />32.47 <br />5.00% <br />1 N/A <br />Ricky Chan <br />136.60 <br />N/C <br />N/C <br />1/30/2015 <br />6/30/2015 <br />48.33 <br />0% <br />N/A <br />Project Engineer <br />Traffic <br />Exempt <br />143.44 <br />N/C <br />N/C <br />7/1/2015 <br />1 6/30/2016 <br />50.75 <br />5.00% <br />N/A <br />150.62 <br />N/C <br />N/C <br />7/1/2016 <br />6/30/2017 <br />53.29 <br />5.00% <br />N/A <br />158.14 <br />N/C <br />N/C <br />7/1/2017 <br />6/30/2018 <br />55.95 <br />5.00% <br />N/A <br />Josh McNeill <br />114.25 <br />N/C <br />N/C <br />1/30/2015 <br />6/30/2015 <br />40.42 <br />0% <br />N/A <br />Project Engineer <br />Traffic <br />Exempt <br />119.95 <br />N/C <br />N/C <br />7/1/2015 <br />6/30/2016 <br />42.44 <br />5.00% <br />N/A <br />125.95 <br />N/C <br />N/C <br />7/1/2016 <br />6/30/2017 <br />44.56 <br />5.00% <br />N/A <br />132.25 <br />N/C <br />N/C 1 <br />7/1/2017 <br />6/30/2018 <br />46.79 <br />5.00% <br />N/A <br />Brad Losey <br />143.05 <br />N/C <br />N/C <br />1/30/2015 <br />6/30/2015 <br />50.61 <br />0% <br />N/A <br />Project Engineer <br />Drainage <br />Exempt <br />150.20 <br />N/C <br />N/C <br />7/1/2015 <br />6/30/2016 <br />53.14 <br />5.00% <br />N/A <br />157.72 <br />N/C <br />N/C <br />11 <br />7/1/2016 <br />6/30/2017 <br />55.80 <br />5.00% <br />N/A <br />165.60 <br />N/C <br />N/C <br />7/1/2017 <br />6/30/2018 <br />58.59 <br />5.00% <br />N/A <br />Page 4 of 11 <br />LPP 15-01 January 14, 2015 <br />