My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MICHAEL BAKER INTERNATIONAL, INC. (f/n/a RBF) 5 - 2015
Clerk
>
Contracts / Agreements
>
M
>
MICHAEL BAKER INTERNATIONAL, INC. (f/n/a RBF) 5 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 11:54:10 AM
Creation date
12/7/2015 4:07:03 PM
Metadata
Fields
Template:
Contracts
Company Name
MICHAEL BAKER INTERNATIONAL, INC. (f/n/a RBF)
Contract #
A-2015-170
Agency
PUBLIC WORKS
Council Approval Date
8/4/2015
Expiration Date
8/4/2019
Insurance Exp Date
8/30/2017
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Assistance Procedures Manual <br />EXHIBIT 10-H COST PROPOSAL Page 1 of <br />SPECIFIC RATE OF COMPENSATION (USE FOR ALL ON -CALL OR AS -NEEDED CONTRACTS) <br />(CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS) <br />RBF Consulting, a Company of Michael <br />Consultant or Subconsultant Baker Corporation Contract RFP No. 14-037 <br />Fringe Benefit% Overhead% <br />46.1 % + 65.2% <br />BILLING INFORMATION <br />EXHIBIT 10-H <br />Cost Proposal <br />Date January 30, 2015 <br />G&A % Combined % <br />+ 45.7% = 156.95% <br />FEE % = 10.0% <br />CALCULATION INFORMATION <br />Name/Classification <br />Hourly Billing Rate <br />Effective date of <br />hourly rate <br />Actual/ <br />average hourly <br />rate <br />%or $ <br />Increase <br />Hourly Range for <br />Class <br />Normal <br />(1O X) <br />(2.0 X) OT <br />From <br />To <br />'dstrand <br />198.42 <br />N/C <br />N/C <br />1/30/2015 <br />6!312015 <br />70 <br />0% <br />N/A <br />Project Engi <br />Active Transportation <br />Exempt <br />8.34 <br />N/C <br />N/C <br />7/ 2015 <br />3012016 <br />3.71 <br />0% <br />N/A <br />218.77 <br />N/C <br />N/C <br />7/1/2016 <br />6/30/2017 <br />77.40 <br />5.00% <br />N <br />229. 1 <br />N/C <br />7/1/2 <br />6/30/2 8 <br />81.27 <br />5.00'/ <br />N/A <br />Chad Harden <br />152.35 <br />N/C <br />N/C <br />1/30/2015 <br />6/30/2015 <br />53.90 <br />0% <br />N/A <br />Project Engineer <br />Structural <br />Exempt <br />159.98 <br />N/C <br />N/C <br />7/1/2015 <br />6/30/2016 <br />56.60 <br />5.00% <br />N/A <br />167.98 <br />N/C <br />N/C <br />7/1/2016 <br />6/30/2017 <br />59.43 <br />5.00% <br />N/A <br />176.37 <br />N/C <br />N/C <br />7/1/2017 <br />6/30/2018 <br />62.40 <br />5.00% <br />N/A <br />Jeremy Franzini <br />143.61 <br />N/C <br />N/C <br />1/30/2015 <br />6/30/2015 <br />50.81 <br />0% <br />N/A <br />Landscape Architect <br />Streetscape Design <br />Exempt <br />150.79 <br />N/C <br />N/C <br />7/1/2015 <br />6/30/2016 <br />53.35 <br />5.00% <br />N/A <br />158.34 <br />N/C <br />N/C <br />7/1/2016 <br />6/30/2017 <br />56.02 <br />5.00% <br />N/A <br />166.25 <br />N/C <br />N/C <br />7/1/2017 <br />6/30/2018 <br />58.82 <br />5.00% <br />N/A <br />Bill Cox <br />172.58 <br />N/C <br />N/C <br />1/30/2015 <br />6/30/2015 <br />61.06 <br />0% <br />N/A <br />Professional Land Surveyor <br />Exempt <br />181.20 <br />N/C <br />N/C <br />7/1/2015 <br />6/30/2016 <br />64.11 <br />5.00% <br />N/A <br />19028 <br />N/C <br />N/C <br />7/1/2016 <br />6/30/2017 <br />67.32 <br />5.00% <br />N/A <br />199.80 <br />N/C <br />N/C <br />7/1/2017 <br />6/30/2018 <br />70.69 <br />5.00% <br />N/A <br />Page 5 of 11 <br />LPP 15-01 January 14, 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.