My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MICHAEL BAKER INTERNATIONAL, INC. (f/n/a RBF) 5 - 2015
Clerk
>
Contracts / Agreements
>
M
>
MICHAEL BAKER INTERNATIONAL, INC. (f/n/a RBF) 5 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 11:54:10 AM
Creation date
12/7/2015 4:07:03 PM
Metadata
Fields
Template:
Contracts
Company Name
MICHAEL BAKER INTERNATIONAL, INC. (f/n/a RBF)
Contract #
A-2015-170
Agency
PUBLIC WORKS
Council Approval Date
8/4/2015
Expiration Date
8/4/2019
Insurance Exp Date
8/30/2017
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Assistance Procedures Manual <br />EXHIBIT 10-H COST PROPOSAL Page 1 of <br />SPECIFIC RATE OF COMPENSATION (USE FOR ALL ON -CALL OR AS -NEEDED CONTRACTS) <br />(CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS) <br />Consultant or Subconsultant Diaz Yourman & Associates Contract RFP No. 14-037 <br />EXHIBIT 10-H <br />Cost Proposal <br />Date January 30, 2015 <br />Fringe Benefit% Overhead% G&A % Combined % <br />Incl. in OH + 215.68% + Incl. in OH = 215.68% <br />FEE % = 10.0% <br />BILLING INFORMATION CALCULATION INFORMATION <br />Name/Classification <br />Hourly Billing Rate <br />Effective date of <br />hourly rate <br />Actual/ <br />average hourly <br />rate <br />% or $ <br />Increase <br />Hourly Range for <br />Class <br />Normal <br />(1 6 X) <br />(2OX) <br />From <br />To <br />V. R. Nadeswaran <br />Project Engineer / Geotechnical <br />Exempt <br />237.14 <br />N/C <br />N/C <br />1/30/2015 <br />6/30/2015 <br />68.29 <br />N/A <br />248.99 <br />N/C <br />N/C <br />7/1/2015 <br />6/30/2016 <br />71.70 <br />5.0% <br />N/A <br />261.44 <br />N/C <br />N/C <br />7/1/2016 <br />6/30/2017 <br />7529 <br />5.0% <br />N/A <br />274.51 <br />N/C <br />N/C <br />7/1/2017 <br />6/30/2018 <br />79.05 <br />5.0% <br />1 N/A <br />S. Niranjanan <br />Project Engineer / Geotechnical <br />Exempt <br />179.11 <br />N/C <br />N/C <br />1/30/2015 <br />6/30/2015 <br />51.58 <br />N/A <br />188.07 <br />N/C <br />N/C <br />7/1/2015 <br />1 6/30/2016 <br />54.16 <br />5.0% <br />N/A <br />197.47 <br />N/C <br />N/C <br />7/1/2016 <br />6/30/2017 <br />56.87 <br />5.0% <br />N/A <br />207-34 <br />N/C <br />N/C <br />7/1/2017 <br />6/30/2018 <br />59.71 <br />5.0% <br />N/A <br />Associate Engineer II <br />Exempt <br />193.56 <br />N/C <br />N/C <br />1/30/2015 <br />6/30/2015 <br />55.74 <br />54.27 - 5720 <br />203.23 <br />N/C <br />N/C <br />7/1/2015 <br />6/30/2016 <br />58.53 <br />5.0% <br />N/A <br />213.40 <br />N/C <br />N/C <br />7/1/2016 <br />6/30/2017 <br />61.4E <br />1 5.0% <br />N/A <br />224.07 <br />N/C <br />N/C <br />7/1/2017 <br />6/30/2018 <br />64.53 <br />5.0% <br />N/A <br />Associate Engineer 1 <br />Exempt <br />173.03 <br />N/C <br />N/C <br />1/30/2015 <br />6/30/2015 <br />49.83 <br />48.08 - 51.58 <br />181.69 <br />N/C <br />N/C <br />7/1/2015 <br />6/30/2016 <br />52.32 <br />5.0% <br />N/A - <br />190.77 <br />N/C <br />N/C <br />7/1/2016 <br />6/30/2017 <br />54.94 <br />5.0% <br />N/A <br />200.31 <br />N/C <br />N/C <br />7/1/2017 <br />6/30/2018 <br />57.69 <br />5.0% <br />N/A <br />Page 8 of 11 <br />LPP 15-01 January 14, 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.