My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MICHAEL BAKER INTERNATIONAL, INC. (f/n/a RBF) 5 - 2015
Clerk
>
Contracts / Agreements
>
M
>
MICHAEL BAKER INTERNATIONAL, INC. (f/n/a RBF) 5 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 11:54:10 AM
Creation date
12/7/2015 4:07:03 PM
Metadata
Fields
Template:
Contracts
Company Name
MICHAEL BAKER INTERNATIONAL, INC. (f/n/a RBF)
Contract #
A-2015-170
Agency
PUBLIC WORKS
Council Approval Date
8/4/2015
Expiration Date
8/4/2019
Insurance Exp Date
8/30/2017
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Assistance Procedures Manual <br />EXHIBIT 10-H COST PROPOSAL Page 1 of 2 <br />SPECIFIC RATE OF COMPENSATION (USE FOR ALL ON -CALL OR AS -NEEDED CONTRACTS) <br />(CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS) <br />Consultant or Subconsultant Diaz Yourman & Associates Contract RFP No. 14-037 <br />EXHIBIT 10-H <br />Cost Proposal <br />Date January 30, 2015 <br />Fringe Benefit% Overhead% G&A % Combined % <br />Incl. in OH + 215.68% + Incl. in OH = 215.68% <br />FEE % = 10.0% <br />BILLING INFORMATION CALCULATION INFORMATION <br />Name/Classification <br />Hourly Billing Rate <br />Effective date of <br />hourly rate <br />Actual/ <br />average hourly <br />rate <br />% or $ <br />Increase <br />Hourly Range for <br />Class <br />Normal <br />OT <br />(1.5 X) <br />OT <br />(2 X) <br />From <br />To <br />Project Engineer II <br />Exempt <br />150.25 <br />N/C <br />N/C <br />1/30/2015 <br />6/30/2015 <br />43.27 <br />N/A <br />157.77 <br />N/C <br />N/C <br />7/1/2015 <br />6/30/2016 <br />45.43 <br />5.0% <br />N/A <br />165.66 <br />N/C <br />N/C <br />7/1/2016 <br />6/30/2017 <br />47.70 <br />5.0% <br />N/A <br />173.94 <br />N/C <br />N/C <br />7/1/2017 <br />6/30/2018 <br />50.09 <br />5.0% <br />1 N/A <br />Staff Engineer11 <br />Exempt <br />101.74 <br />N/C <br />N/C <br />1/30/2015 <br />6/30/2015 <br />29.30 <br />29.26 - 29.34 <br />106.83 <br />N/C <br />N/C <br />7/1/2015 <br />6/30/2016 <br />30.77 <br />5.0% <br />N/A <br />112.17 <br />N/C <br />N/C <br />7/1/2016 <br />6/30/2017 <br />32.31 <br />5.0% <br />N/A <br />11T78 <br />N/C <br />N/C <br />7/1/2017 <br />6/30/2018 <br />33.93 <br />5.0% <br />N/A <br />Staff Engineer 1 <br />Exempt <br />92.37 <br />N/C <br />N/C <br />1/30/2015 <br />6/30/2015 <br />26.60 <br />26.44 - 26.76 <br />96.99 <br />N/C <br />N/C <br />7/1/2015 <br />6/30/2016 <br />27.93 <br />5.0% <br />N/A <br />101.84 <br />N/C <br />N/C <br />7/1/2016 <br />6/30/2017 <br />29.33 <br />5.0% <br />N/A <br />106.93 <br />N/C <br />N/C <br />7/1/2017 <br />6/30/2018 <br />30.80 <br />5.0% <br />N/A <br />CADD <br />Exempt <br />76.64 <br />N/C <br />N/C <br />1/30/2015 <br />6/30/2015 <br />22.07 <br />N/A <br />80.47 <br />N/C <br />N/C <br />7/1/20 <br />6/30/2016 <br />23.17 <br />5.0% <br />N/A <br />84.49 <br />N/C <br />N/C <br />7/1/20115 6 <br />6/30/2017 <br />24.33 <br />5.0% <br />N/A <br />88.72 <br />N/C <br />N/C <br />7/1/2017 <br />6/30/2018 <br />25.55 <br />5.0% <br />N/A <br />Page 9 of 11 <br />LPP 15-01 January 14, 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.