My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - CLIMATE ACTION PLAN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
12/15/2015
>
75B - PH - CLIMATE ACTION PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2015 5:00:24 PM
Creation date
12/10/2015 4:36:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75B
Date
12/15/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
36 <br />Transportation & Land Use <br />i. IF <br />3 Climate Action Plan Measures <br />Type of Measure <br />In addition to external connectivity issues, internal bicycle and <br />.......... Ordinan °a ....... ............ a <br />pedestrian connections within a development site are also <br />Emissions Reduction <br />an important factor in facilitating non - automotive travel. The <br />in 2020 <br />level of connectivity relates to the ability to travel within the <br />311 MTCO,e <br />•.••.••••••••••••••.•.••••. .••..•..•.......•••••.......••. <br />development to other locations without having to use vehicles <br />Emissions Reduction <br />or an external roadway network. Internal connectivity is often <br />in 2036 <br />hindered through the use of fencing to segregate uses within a <br />4,984 MTCO,e <br />°°°°°°. °. °. ° ° °' ° ° °••'. °"•••'•" °• "•"••' <br />mixed -use site, lack of sidewalks and bicycle connections, and <br />Co- Bonefits <br />Other related Items. <br />Reduced energy cost — residents; <br />Improved air quality; improved <br />The City will create guidelines that address internal site <br />health; improved public realm <br />••• •• ° °• ° ° ° °. ° ° ° °. ° ° ° °. ... ° °. ° °. .... <br />connectivity within new development sites. Issues that will <br />Cost to city <br />be addressed include fencing or other physical barriers, <br />Low to Medium <br />°• °•••• °•••• °• °•• °•• °••••• °•° ° ° ° °•• ° °° <br />sidewalks, landscaping, and other related items. These <br />Private Cast <br />guidelines will be referenced in the Zoning Code or Citywide <br />Low <br />••.•••..•.••••.•••••.•••••• ......•••.••.••••..•.••........ <br />Design Guidelines and other applicable documents. <br />Potential Funding Sources <br />General Fund <br />Ease of Implementation <br />Medium <br />75B -44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.